Preserving History with Pride and Care

Unilock

The new admissions building at Miss Porter’s School used Unilock products to help preserve the historical feel of the site while also providing much needed durability.

For over 325 years a building has stood on the east bank of the Farmington River. Once a grist mill, this historic landmark has had the identity of a residence, boutique shop, fabric store, bookstore and even a successful restaurant. In 2014, the building and the land were donated to the Miss Porter’s School — Farmington, Conn.’s premier college preparatory school that excels in academics and athletics. This captivating site would be transformed into the new admissions building.

During the renovation the school saw the importance of preserving the historic features and character. What was once a sea of asphalt parking, the exterior of the site was converted into an arrival garden and accessible walk by The Berkshire Design Group of Northampton, Mass. It was important to find and use materials that would keep the feel of the site and stand the test of time. Unilock Town Hall paver is utilized in the plaza and walkway areas, which are adjacent to the large lawn area, a destination for school celebrations. Unilock Rivercrest Wall system forms a raised planter filled with shrubs, ground covers and bulbs to frame views of the river.

Installation was provided by Starr Contracting, LLC of Avon Conn. With pride and care, the team at Starr incorporated many existing site structures into the whole project, including one of the original mill stones.

This site is an area which will showcase and celebrate Farmington’s history for years to come.

www.unilock.com

This article originally appeared in the issue of .

Featured

  • Geometric abstract school illustration

    How Design Shapes Learning and Success

    Can the color of a wall, the curve of a chair, or the hum of fluorescent lights really affect how a student learns? More schools are beginning to think so.

  • Rhode Island Boarding School Completes Student Dorm Renovations

    St. George’s School in Middletown, R.I., recently announced the completion of a $26-million renovation project on Arden-Diman-Eccles Dormitory, according to a news release. The school partnered with Voith & Mactavish Architects (VMA) on the new space, which places a new focus on collaborative community spaces open to both boarding students and day students.

  • Image courtesy of Kahler Slater

    UW–Madison Announces Completion of Morgridge Hall

    The University of Wisconsin–Madison recently announced that construction is complete on Morgridge Hall, a new academic building, according to a news release. The facility opened September 3 at the start of the fall semester, consolidating the School of Computer, Data & Information Sciences into a single facility for the first time.

  • Kimball International Releases Curated Design Support Program

    Commercial furnishings company Kimball International recently announced the launch of a new end-to-end design support program, DesignSuite. According to a news release, its goal is to guide architecture & design professionals and dealer partners through the process from vision to specification.