Rodents: How Are They Getting In, How Do We Stop Them?

It’s critical that pest problems be identified and addressed as quickly as possible because rodents breed quickly — a single pair of rats can multiply into 640 within a year, and mice can multiply to over 1,000. Stopping them for good means finding the points of entry and sealing them up to prevent future invasion. Below are some of the most common entry points and exclusion solutions. Remember, when conducting your inspection, mice can fit through a gap of about 1/4 inch and rats through a gap of 3/8 inch.

Common Entry Points and Solutions:

  • Exterior doors — Damaged or worn out sweeps are one of the most common entry points. Most standard brush or vinyl sweeps keep out the weather but not mice and rats. All doors should be fitted with specialized rodent-proof door sweeps.
  • Vents and grilles — Protect them with screen or mesh and ensuring any voids or gaps around them are filled with a pest exclusion material.
  • Drain pipes — Rats are excellent swimmers. Make sure exterior drain and sewer access points are covered with an appropriate metal cover. Openings surrounding the drain should be patched or filled.
  • Vertical wires and pipes — Mice and rats are excellent climbers. Circular rat guards should be placed around all vertical wires and pipes.
  • Utility and other building penetrations — Check places where pipes, wires or HVAC enter the building and fill any gaps with pest exclusion material.

Ensure the exterior of the building, especially around the foundation, is free from harborage areas such as shrubs and ground cover, and eliminate any “bridges” to the roof, like overhanging trees.

This article originally appeared in the issue of .

About the Author

Drew McFadden is director of Marketing for Xcluder, and can be reached at [email protected].

Featured

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • Spaces4Learning Announces 2026 Product Award Winners

    Spaces4Learning has just announced the winners of the 2026 Product Awards! The award program spotlights outstanding product development achievements of manufacturers and suppliers whose products or services are considered to be particularly noteworthy in their ability to enhance K–12 and higher-education learning environments.

  • Wold Completes Geothermal Projects at Two Minnesota Schools

    Wold Architects & Engineers recently announced that it has completed two geothermal expansion projects for Mounds View Public Schools in Shoreview, Minn., according to a news release. The work at Highview Middle School and Irondale High School serves the district’s long-term goal of reducing energy costs and dependency on non-renewable fuel sources, as well as improving building performance.

  • Cal Poly Humboldt Starts Construction on Healthcare Education Hub

    California State Polytechnic University, Humboldt in Arcata, Calif., recently announced that work has begun on a renovation project that will turn the Stewart Building into a new Healthcare Education Hub, according to a news release. The university is partnering with Sundt Construction Inc. for construction services.