Puerto Rico High School Re-Envisioned Following Hurricane

Wesleyan High SchoolWith the intention to integrate building design techniques and technologies that not only comply with needs, but also respond to the human experience, building life cycle and operational efficiency, Fosis Corp. has started a new project which will re-create Wesleyan Academy's high school building.

Along with many other buildings in Puerto Rico, the Academy high school building was destroyed due to Category 5 hurricane Maria. Consequently, Fosis proposed a project to respond to the needs of high school staff and students.

Fosis cofounder and Principal Designer, Carlos Martinez Alfaro, explained "the project aims to relate with the day-to-day life of the student. Our intention is to achieve a space that stimulates learning and creates a sense of identity."

The design intends to promote natural light and ventilation, and scheme spaces that will adjust to students and the administration while integrating the existence gym facility with the new construction.

Designing a building that creates a unique identity while respecting the campus scale and administrative vision and helps create multidisciplinary integration are major goals of the new project. Nevertheless, the design seeks to provide an enriching student life experience, increase student retention and loyalty while attracting new students.

With an initial investment of $1.5 million, the construction is expected to begin in January 2018 and be completed by August 2018.

Featured

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • Spaces4Learning Announces 2026 Product Award Winners

    Spaces4Learning has just announced the winners of the 2026 Product Awards! The award program spotlights outstanding product development achievements of manufacturers and suppliers whose products or services are considered to be particularly noteworthy in their ability to enhance K–12 and higher-education learning environments.

  • Wold Completes Geothermal Projects at Two Minnesota Schools

    Wold Architects & Engineers recently announced that it has completed two geothermal expansion projects for Mounds View Public Schools in Shoreview, Minn., according to a news release. The work at Highview Middle School and Irondale High School serves the district’s long-term goal of reducing energy costs and dependency on non-renewable fuel sources, as well as improving building performance.

  • Cal Poly Humboldt Starts Construction on Healthcare Education Hub

    California State Polytechnic University, Humboldt in Arcata, Calif., recently announced that work has begun on a renovation project that will turn the Stewart Building into a new Healthcare Education Hub, according to a news release. The university is partnering with Sundt Construction Inc. for construction services.