Storage made Easier with LEVPRO

storage

Cambridge Elementary was able to organize their storage spaces and free up space by utilizing the new LEVPRO system.

Cambridge Elementary in Cambridge, Wis., recently installed a LEVPRO system to revamp previously cramped and cluttered storage areas. Before LEVPRO, the school’s staff was consistently frustrated because it took them a long time to find equipment and put it away properly. With LEVPRO, teachers moved all frequently used items into the units by the gym and got rid of their rundown, homemade shelving. By adding capacity and storing similar items together, staff now can quickly and easily find what they need. And, cleaning under the shelving and returning items after class is a breeze.

Says Anneke Legge, physical education teacher. “With LEVPRO, finding and storing equipment is seamless, allowing our staff to spend more time planning and preparing for class, and less time hunting down equipment and supplies. The extra capacity in the new system also created space for new inflatable kayaks for our pool, and we still have some extra space for new gear.”

Available now, the new LEVPRO line will be manufactured in Spacesaver’s Fort Atkinson, Wis.-based manufacturing facility. It can be purchased online and bought in partnership with Spacesaver’s network of independent distributors who work with customers through every step of the design and installation process.

“Spacesaver is always looking for new ways to help customers creatively tackle their storage needs,” says Spacesaver CEO Mark Haubenschild. “Saving time, increasing productivity and doing more with the space they have are essential for our K-12 educational customers.”

www.spacesaver.com

This article originally appeared in the School Planning & Management January 2018 issue of Spaces4Learning.

Featured

  • Vanderbilt to Partner with ABM for Campus Preservation and Modernization

    Vanderbilt University recently announced that it has selected ABM Performance Solutions for a preservation and modernization project at its New York City campus, according to a news release. ABM will deliver its end-to-end ABM Performance Solutions (APS) model to manage critical operations during renovation and maintenance.

  • NWEA Report Recommends K–12 Natural Disaster Recovery Strategies

    The Northwest Evaluation Association (NWEA), a K–12 assessment and research organization, recently announced the release of a new playbook for schools and communities recovering from extreme weather events, according to a news release.

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • Spaces4Learning Trends & Predictions for Educational Facilities in 2026: Part II

    As education leaders look toward 2026, the design of K–12 and higher education facilities is being reshaped by powerful, converging forces. Survey respondents point to the rapid growth of Career and Technical Education, deeper alignment with workforce and industry needs, and the accelerating influence of AI and emerging technologies.