Grayson College Gets Approval for New Construction

Grayson College CenterNew construction projects are planed in the upcoming months for Grayson College in Grayson County, TX. A new viticulture lab and student success building project were recently approved by the Grayson College Board of Trustees.

The new student success center will be located behind the administration building for the college (pictured), while the viticulture center will reside alongside the current Viticulture and Enology center.

The new student success center will feature administrative offices and also contain a math hub and testing center. The project will also provide much-needed study space for students. The viticulture lab and student success center are joining other recent planned construction projects at Grayson, including a 100-bed dorm and various other facility improvements on-campus.

The two projects are being funded by reserves budgeted by the institution without using bonds. Plyler Construction of Sherman, TX, will be handling both projects.

Featured

  • Baton Rouge Center for Visual and Performing Arts

    Baton Rouge Center for Visual and Performing Arts

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Baton Rouge Center for Visual and Performing Arts has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.

  • Secret to Efficient, On-Time School Infrastructure & Modernization Projects is All in the Preparation

    Warmer weather and longer days make summer the ideal time for construction and modernization projects at educational facilities. School boards and construction firms must coordinate effectively to ensure that these projects do not extend even a single day into the school year and impede classroom operation.

  • Girl Sitting at Library Desk, Using Laptop

    How Campus Design Shapes the Finals Week Experience

    Academic performance is not just about preparation. It is closely tied to how students manage stress, maintain their energy, and shift between work and recovery modes. Much of that is influenced, directly or indirectly, by design.

  • Florida District Completes Construction on New Leadership Institute

    Pinellas County Schools near Tampa, Fla., recently announced that construction is complete on the new Dr. Michael A. Grego Leadership Institute, according to a news release. The district partnered with Rowe Architects for the project’s design and with Skanska for construction services.