Grayson College Gets Approval for New Construction

Grayson College CenterNew construction projects are planed in the upcoming months for Grayson College in Grayson County, TX. A new viticulture lab and student success building project were recently approved by the Grayson College Board of Trustees.

The new student success center will be located behind the administration building for the college (pictured), while the viticulture center will reside alongside the current Viticulture and Enology center.

The new student success center will feature administrative offices and also contain a math hub and testing center. The project will also provide much-needed study space for students. The viticulture lab and student success center are joining other recent planned construction projects at Grayson, including a 100-bed dorm and various other facility improvements on-campus.

The two projects are being funded by reserves budgeted by the institution without using bonds. Plyler Construction of Sherman, TX, will be handling both projects.

Featured

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.

  • Montclair State University Starts Construction on $120M STEM Building

    Montclair State University in Montclair, N.J., recently broke ground on a new $120-million Interdisciplinary Science Building, according to university news. The university partnered with HoK Architects for the project’s design, and it’s scheduled to open in time for the 2028–29 academic year.

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • Minnesota District Converts Middle School into Community Hub

    White Bear Lake Area Schools in White Bear Lake, Minn., recently announced the end of a major renovation project that converted a former middle school into a new centralized district and community hub, according to a news release.