Concrete Slab Configuration Raises Concerns Among Sports Flooring Installers

OAKBROOK TERRACE, IL – Concrete slab configuration is very important in the success of a new maple floor installation.  Placing a below-slab vapor barrier directly beneath the concrete slab is proper and typical.  Placing any type of fill material between the below-slab vapor barrier and the concrete slab frequently causes moisture-related problems with the finished maple surface.

The Maple Flooring Manufacturers Association (MFMA) requires the general contractor to provide a concrete slab troweled smooth and flat to a tolerance of 1/8 of an inch in a 10-foot radius, subject to the approval of the MFMA wood flooring contractor. By placing sand between the vapor barrier and the slab, a flatter concrete slab with less initial curling can be produced.  However, this configuration allows the sand to act like a sponge—trapping moisture within the sand layer during the concrete pour. Over time, trapped moisture can migrate up through the concrete slab and cause moisture-related difficulties with subfloor components and the finished wood flooring surface.

The only MFMA-recognized method for reading concrete moisture levels within a slab is by testing its relative humidity. Please refer to the instructions of the manufacturer’s relative humidity test kit for complete details on how to administer the test correctly. MFMA recommends the relative humidity level for a concrete slab for a non-glue-down maple floor system be 85 percent or lower and for glue down systems the concrete slab relative humidity level should be 75 percent or lower before installation.For concrete relative humidity conditions above MFMA’s recommendation consult your MFMA Sport Floor Contractor or your MFMA Manufacturer.

For more information regarding variations to MFMA’s recommended concrete slab configuration, please contact MFMA’s technical director at 888/480-9138 or email [email protected].

Featured

  • Abstract tech network data connections with orange, blue glowing dots, lines

    3 Trends for Higher Education to Stay Ahead of in 2026

    As universities enter the new year, the question is no longer whether digital transformation is necessary, but how quickly institutions can convert technological potential into strategic advantage.

  • Campus Safety Requires Using Every Resource Available

    Across the U.S., school and campus leaders are facing a security landscape that has changed dramatically over the past decade. Incidents on school property have increased in recent years, with several consecutive years setting record totals. According to analysis of data by CNN, dozens of shootings now occur on school grounds annually across K-12 and higher education environments.

  • Vanderbilt to Partner with ABM for Campus Preservation and Modernization

    Vanderbilt University recently announced that it has selected ABM Performance Solutions for a preservation and modernization project at its New York City campus, according to a news release. ABM will deliver its end-to-end ABM Performance Solutions (APS) model to manage critical operations during renovation and maintenance.

  • Photo credit - Chuck Coates

    Florida District Modernizes Central Energy Plants at Two High Schools

    Flagler Schools, a public school district in Flagler County, Fla., recently partnered with Matern Professional Engineering to modernize the central energy plants at two of its high schools, according to a news release. The project is part of a larger, district-wide effort to reduce energy costs and operational expenses.