Event Management, and Campus Security Revamped

de Toledo High School in Los Angeles, Calif., is home to 400 students plus 127 faculty and staff. David Marcus, de Toledo’s business manager, first joined the high school in 2006 after five years as a founding board member. When the school began to construct its new campus in 2012—one of the biggest initial challenges David faced was the management of their facilities rental program. In addition to student events, the school hosts about 3,000-plus events and works with over 64 outside organizations including, a swim academy, youth sports programs and more. Previously, the school had used a paper system for scheduling these events, which David describes as “clunky” and ineffective.

Relying on administrative assistants to write down scheduled events on calendars didn’t capture the full scope of event management, and they had difficulty determining available space. David chose SchoolDude’s event management system to help them streamline event management with an electronic process and to also keep track of everything from set-up/cleanup to supplies to calendars. With a paperless solution, de Toledo gained control over the thousands of events they host throughout the year and eliminated double bookings, raising the school’s profile as a steward in the community.

But with a higher volume of people coming and going from the property outside of school hours, concerns were raised about security. Working with a team of safety consultants, de Toledo created a new robust safety program, including a visitor ID program, lockdown procedures, access control badge entry for students and faculty, and much more. Previously, their safety plans were stored in binders and within PDFs online, but now faculty, students and parents can easily access safety plans on their mobile device with SchoolDude’s mobile safety solution. Thanks to SchoolDude’s solution, they can now report incidents and push safety updates to users electronically, eliminating the need for costly reprints.

www.dudesolutions.com

This article originally appeared in the School Planning & Management February 2018 issue of Spaces4Learning.

Featured

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

  • California High School Starts Construction on New CTE Building

    Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking.

  • modern college building with circuit and brain motifs

    Anthropic Introduces Claude for Education

    Anthropic has launched a version of its Claude AI assistant tailored for higher education institutions. Claude for Education "gives academic institutions secure, reliable AI access for their entire community," the company said, to enable colleges and universities to develop and implement AI-enabled approaches across teaching, learning, and administration.

Digital Edition