Integrated Sciences Center Breaks Ground at Lafayette College

Lafayette College in Easton, PA, recently unveiled plans for their new Rockwell Integrated Sciences Center. The new building will house students pursuing various scientific disciplines, including biology, computer science, neuroscience, and other sciences.

Lafayette College

The new innovative space, the largest capital project in the school’s history, will focus on creating spaces that can adapt to new technology, and bring students from different disciplines together. It will also include the college’s IDEAL Center for Innovation and Entrepreneurship.

 The building design was handled by Boston firm Payette and The Harman Group, and the project is targeting LEED Gold certification with a projected completion date in the fall of 2019.

Featured

  • Chicago District Completes Construction on New Elementary School

    North Chicago School District 187 in North Chicago, Ill., recently held a ribbon-cutting ceremony for the new Forrestal Elementary School, according to a news release. The new school marks a major investment in military-connected students and families at Naval Station Great Lakes.

  • Arizona District Breaks Ground on Community Training, Learning Center

    The Tolleson Union High School District (TUHSD) in Tolleson, Ariz., recently broke ground on a new Training & Learning Center (TLC) for both district professionals and the community at large, according to a news release. The 90,000-square-foot facility has an estimated completion date of spring 2027.

  • abstract illustration of school gym

    How the Gymnasium Can Serve as a Model for Learning Space Design

    Multipurpose gyms work because flexibility was built into the brief from the start, not retrofitted later. The same logic applies to academic spaces.

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.