Integrated Sciences Center Breaks Ground at Lafayette College

Lafayette College in Easton, PA, recently unveiled plans for their new Rockwell Integrated Sciences Center. The new building will house students pursuing various scientific disciplines, including biology, computer science, neuroscience, and other sciences.

Lafayette College

The new innovative space, the largest capital project in the school’s history, will focus on creating spaces that can adapt to new technology, and bring students from different disciplines together. It will also include the college’s IDEAL Center for Innovation and Entrepreneurship.

 The building design was handled by Boston firm Payette and The Harman Group, and the project is targeting LEED Gold certification with a projected completion date in the fall of 2019.

Featured

  • ed tech conference calendar

    Upcoming Awards, Events & Webinars

  • Campus Safety Requires Using Every Resource Available

    Across the U.S., school and campus leaders are facing a security landscape that has changed dramatically over the past decade. Incidents on school property have increased in recent years, with several consecutive years setting record totals. According to analysis of data by CNN, dozens of shootings now occur on school grounds annually across K-12 and higher education environments.

  • Agricultural Sciences Complex

    Agricultural Sciences Complex

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The College of Western Idaho's Agricultural Sciences Complex has been recognized with an EDS 2026 Grand Prize award in the category of New Construction.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.