Gateway Project Begins at Lycoming College

Lycoming College in Williamsport, PA, recently began its “Gateway Project,” a large-scale construction project which will create a new entrance to the college with multiple new buildings. The new facilities for the college will include a new admissions building, a welcome center, a café, and an alumni center.

The new face of the campus is part of a larger plan to revitalize the Wiliamsport downtown area. The new space will provide spaces for both college students and Williamsport community members to use and enjoy. Construction for the Gateway Project is set to be completed in fall 2019.

Lycoming College

Featured

  • Doerr School of Sustainability Accelerator

    From Concrete Warehouse to Innovation Hub: Accelerating Sustainability at Stanford

    The transformation of a once windowless, concrete publishing warehouse into a sun-drenched center for global innovation began with a single, fundamental challenge: how to turn an industrial storage shell into a space built for human connection.

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Girl Sitting at Library Desk, Using Laptop

    How Campus Design Shapes the Finals Week Experience

    Academic performance is not just about preparation. It is closely tied to how students manage stress, maintain their energy, and shift between work and recovery modes. Much of that is influenced, directly or indirectly, by design.

  • Academy of Classical Education Breaks Ground in Louisiana

    Charter Schools USA (CSUSA) recently announced the groundbreaking of a new public charter school in Covington, La., according to a news release. The Academy of Classical Education at Covington will enroll students in grades K–8 and is scheduled for completion in August 2026, just in time for the new school year.