Renewable Energy Initiatives Enhance Campus

Ameresco

Roxbury Community College partnered with Ameresco to both save energy, and create a sustainable energy solution for the campus and community.

Founded in 1973, Roxbury Community College (RCC) is a multicultural, urban, student-centered, open-access community college located in the Roxbury neighborhood of Boston, MA. RCC offers associates degree and certificate programs, online courses, corporate and community education programs, and lifelong-learning courses.

When current President Dr. Valerie Roberson took office in 2013, she was immediately faced with millions of dollars in deferred maintenance at the 16-acre, five-building urban campus that houses classrooms, specialized science and computer laboratories, the Library and Learning Center, the Reggie Lewis Track & Athletic Center, and the Media Arts Center.

In August 2016, RCC partnered with Ameresco for a $20.1 million energy savings performance contract (ESPC), that was part a larger $72.5 million ongoing renovation project to help modernize the campus. Completed in 2017, the ESPC provides a great example of how the combination of energy efficiency and renewable sources of energy delivered a winning budget-neutral sustainable solution for the urban campus and the entire community.

The tri-level renewable energy solution for parking lot 1 is the most unique aspect of the project. It includes 115 geothermal wells, 500-feet-deep beneath parking lot 1, designed to capture energy for heating and cooling the campus. On the surface, there is parking for 320 cars, in addition to electric charging stations for up to six cars. Above the lot, there is a solar canopy with approximately 3,000 solar panels representing nearly a megawatt of power. In addition, there is efficient LED lighting under the PV canopy deck to help increase security for students.

The overall ESPC project, which encompasses a total of 23 energy conservation measures, is expected to save RCC about $860,000 annually that can go back to serving students and community.

www.ameresco.com

This article originally appeared in the College Planning & Management June 2018 issue of Spaces4Learning.

Featured

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

  • California High School Starts Construction on New CTE Building

    Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking.

  • modern college building with circuit and brain motifs

    Anthropic Introduces Claude for Education

    Anthropic has launched a version of its Claude AI assistant tailored for higher education institutions. Claude for Education "gives academic institutions secure, reliable AI access for their entire community," the company said, to enable colleges and universities to develop and implement AI-enabled approaches across teaching, learning, and administration.

Digital Edition