How Rubber Flooring Impacts Life-Cycle Costs

The demands placed on flooring in educational facilities are significant. Steady foot traffic and heavy rolling loads can quickly compromise a floor’s original beauty and integrity. With increasing pressure to lower operational expenses, many learning institutions are turning to Life-Cycle Cost Analysis (LCCA) to determine which flooring material offers the greatest durability and resilience, and how that directly translates to value and cost savings. Rubber flooring has proven to be a leader in this category. Here’s why:

  • Installation
    Rubber flooring with a self-adhesive backing can be installed directly over an existing floor. It has fewer seams with less cutting and joint sealing, resulting in faster turn-times reducing your timeline by up to half.
  • Durability
    The extremely dense surface of rubber flooring can withstand the pressure of heavy loads and is highly resistant to liquid spills and harsh chemicals.
  • Maintenance
    Flooring maintenance can account for 75 to 90 percent of total cost over the product’s projected lifespan. Premium rubber flooring has a nonporous surface that inherently repels stains and can be cleaned with little more than water. Unlike other resilient flooring, rubber’s uncoated surface means the floor never needs to be stripped and resealed.
  • Sustainability
    Rubber flooring is naturally sourced and has a low-VOC rating, contributing to a healthier environment and improved indoor air quality (IAQ) for students and staff alike.

Premium rubber flooring has significant impact on total cost of ownership. Using LCCA during flooring specification helps schools lower expenses long-term while increasing the health and safety of students, faculty, and staff.

This article originally appeared in the School Planning & Management June 2018 issue of Spaces4Learning.

About the Author

Tasha Hughes is a marketing specialist, PR, for nora systems, Inc. (www.nora.com/us). She can be reached at [email protected] or 800-332/NORA.

Featured

  • URI Cuts Underwater Ribbon on New Ocean Robotics Laboratory

    The University of Rhode Island recently held a ribbon-cutting ceremony for a new Ocean Robotics Laboratory at its Narragansett Bay Campus, according to a news release. Two students used a remotely operated vehicle to cut an underwater ribbon in a 30-by-20-foot test tank.

  • KWK Architects Announces Full Transition to Lawrence Group Branding

    KWK Architects recently announced that it will complete its transition to the Lawrence Group brand effective July 1, according to a news release. The merger marks the end of a three-year strategic integration process that began in March 2023 to unite the firms.

  • Myrtle Grove Elementary

    Phased Construction Keeps Students on Campus During Rebuild

    When Escambia County School District needed to replace most of Myrtle Grove Elementary School in Pensacola, Fla., it had three distinct challenges: honor the school's legacy in the community, bring state-of-the-art learning environments to the county, and be seamlessly built on the same site as the active school campus.

  • Hawaii Elementary School Reopens Following $25M Campus Modernization

    Haʻaheo Elementary School in Hilo, Hawaii, has reopened to students following a three-year, $25-million campus modernization and expansion project that significantly increases the school's instructional space while preserving one of the island's oldest educational institutions, according to local news.