Zoned Technology Leads to Lower Electric Bills

Misubishi

With Zoned Comfort Solutions from Mitsubishi Electric, St. Joseph’s no longer fears high electrical bills and is able to offer students and teachers a comfortable learning environment year-round.

After many years running on an outdated boiler system and noisy AC units, St. Joseph School, in Pilot Grove, Mo., needed to find an HVAC system that could efficiently cool and heat the 5,400-square-foot building without disrupting day-to-day activities. The solution: Zoned Comfort Solutions from Mitsubishi Electric Cooling & Heating.

With these needs in mind, the school worked with Jamie Callahan of Air and Water Solutions. Callahan believed there was only one solution for St. Joseph’s—zoned technology, and he recommended Zoned Comfort Solutions from Mitsubishi Electric as the brand for the school to install. He said, “The school didn’t want to reuse the gas boiler, and with the energy efficiency of Mitsubishi Electric units, it was the only option.”

The installation took only two weeks and Callahan has received nothing but positive feedback from the school, specifically with the system’s ability to offer cost savings. He said, “From what I’ve heard, the school went from paying thousand dollar electric bills to paying $245 a month. That’s nearly 25 percent of the original cost.”

The staff agrees that the experience has been great. Principal Nichole Watring said, “We have not had any issues with the system and the teachers and students love that they can control the temperature of their rooms. It’s much quieter and more efficient than the previous system.”

The school was also pleased with the system’s appearance. School Manager Donna Gerke said, “We looked for a system that offered more cost savings and efficiency but aesthetics was an added bonus. It’s given the school a whole new look on the inside. It looks fresher and cleaner.”

With Zoned Comfort Solutions from Mitsubishi Electric, St. Joseph’s no longer fears high electrical bills and is able to offer students and teachers a comfortable learning environment year-round.

www.mitsubishicomfort.com

This article originally appeared in the School Planning & Management June 2018 issue of Spaces4Learning.

Featured

  • Spaces4Learning Launches 2025 New Product Awards

    Spaces4Learning is now accepting entries for the 2025 New Product Awards! The program’s goal is to honor the outstanding product development achievements of manufacturers and suppliers whose products and services are particularly noteworthy in helping to improve K–12 and Higher Education learning environments.

  • University of Kentucky Integrates New Cleaning Technology

    The University of Kentucky in Lexington, Ky., recently installed a new cleaning system designed to improve cooling efficiency on campus, according to a news release. The Facilities Management’s Utilities and Energy Management Unit installed new chiller tubes into two of the chillers at the university’s Central Utility Plant.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • Gretna East High School

    Gretna East High School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Gretna East High School has been recognized with an EDS 2025 Project of Distinction award in the category of New Construction.

Digital Edition