Madison Area Technical College Breaks Ground on New South Campus

Madison Area Technical College in Madison, WI, broke ground recently for the school’s new South Campus. The campus is the product of the college working with community leaders to address existing educational and training gaps in South Madison. It is designed to include meeting rooms, classrooms, and a suite of additional community/social service offices. The South Campus will also serve as a hub for STEM and IT training, which will be offered to both current students and the citizens of South Madison.

Madison Area Technical College South Campus

Funding for the project includes a $3 million contribution from Great Lakes Corporation, which will match gifts from other donors. The South Campus is currently in the phase of site redevelopment and initial construction and is planned to open in the fall of 2019.

Featured

  • abstract illustration of school gym

    How the Gymnasium Can Serve as a Model for Learning Space Design

    Multipurpose gyms work because flexibility was built into the brief from the start, not retrofitted later. The same logic applies to academic spaces.

  • Philadelphia Middle School Facility Earns LEED Gold Certification

    The Alternative Middle Years (AMY) at James Martin Middle School in Philadelphia, Penn., recently received a LEED Gold certification from the U.S. Green Building Council, according to a news release. The School District of Pennsylvania partnered with KSS Architects on the project.

  • Big Horn Academy

    Big Horn Academy

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Big Horn Academy has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.

  • Cleveland High School Breaks Ground on Modernization

    Portland Public Schools in Portland, Ore., recently announced that construction has begun on a modernization project for Cleveland High School, according to a news release. The existing building will be replaced with a new, 300,000-square-foot facility at the same site.