Using VRF Systems to Solve HVAC Challenges

Variable refrigerant flow (VRF) is a leading edge, globally proven HVAC technology that can help solve many HVAC challenges faced by educational facilities:

Increasing Energy Efficiency
VRF systems with inverter-driven compressors can reduce energy bills up to 25 percent.

Lower Lifecycle Costs
VRF’s installation and operational costs are often lower than those of traditional systems. Standard controls and simpler installation save on materials and labor.

Delivering Fresh Air
With advanced filters, zoning capabilities, and integration with ventilation systems, VRF can help meet indoor air mandates.

Limiting Operational Noise
VRF eliminates disruption indoors and out. Indoor units operate as quietly as 27 decibels and outdoor units are quieter than traditional systems.

Varying Loads Needs
Full-range variable capacity delivers only the amount of conditioning required to match a zone’s cooling or heating demand. Using integrated controls and sensors that measure conditions within each zone, the compressor adjusts speeds to maintain the desired zone temperature.

Solving Comfort Issues
VRF’s zoning offers personalized comfort control, including the ability to simultaneously cool and heat from one heat recovery system.

Controlling Multiple Spaces
VRF can integrate with third-party software. Beyond that, VRF offers a wide variety of controls options, from individual zone controllers to centralized controllers that monitor, schedule, and control multiple indoor units through a web browser.

Minimizing Maintenance
Limited maintenance is necessary and doesn’t require a specialized service contractor.

This article originally appeared in the College Planning & Management September 2018 issue of Spaces4Learning.

About the Author

James DeBerry is commercial marketing manager for Mitsubishi Electric Cooling & Heating (MitsubishiPro.com). He can be reached at [email protected] or 888-979-9686.

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.