Florida Southern College Breaks Ground on New School of Physical Therapy

Florida Southern College (FSC) in Lakeland, FL, recently broke ground on its new School of Physical Therapy, a stunningly designed facility that will supply highly trained physical therapists to healthcare facilities in central Florida and beyond. The new Schoolwill be strategically located on South Florida Avenue in Lakeland, less than a mile from FSC’s main campus.

Southern Florida

Renovation and construction work is underway on an existing 6,500-square-foot building, with an 11,000-square-foot addition to come. The structure will be a great addition to the Dixieland corridor, a historic district in Lakeland. Scheduled to open in August 2019, the building will include faculty offices, classrooms, and a state-of-the-art lab.

The architect on the project is Wallis Murphey Boyington Architects, with construction work to be completed by Rodda Construction. Mike Murphey, WMB partner with ROI Solutions, said the building’s design is inspired by the work of architect Frank Lloyd Wright, notably including elements reminiscent of the colored-glass “textile blocks” Wright incorporated into his designs for the Florida Southern campus.

Featured

  • New Arizona Fine Arts School Reaches Construction Milestone

    Construction of the new Hilltop School for the Arts and Theater in Litchfield Park, Ariz., recently hit a significant milestone, according to a news release. The Agua Fria High School District held a beam-signing ceremony to celebrate the building’s topping out, or the placement of its last structural beam.

  • How a Portable Sink Helped an Art Classroom Run More Smoothly

    Classroom design decisions can have outsized effects on instructional time and safety at schools juggling mismatched infrastructure, strict budgets, and crowded schedules — particularly in the arts. Between spilled paint and dirty brushes, art classes run smoother with a sink in the studio. But many schools don’t have a sink in every art classroom.

  • Colorado School District Breaks Ground on Unified PK–12 Campus

    The Haxtun School District No. Re-2J in Haxtun, Colo., recently announced that ground has been broken on a renovation/addition project that will unite its two schools, Haxtun Elementary and Haxtun Jr/Sr High School, according to a news release.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.