Florida Southern College Breaks Ground on New School of Physical Therapy

Florida Southern College (FSC) in Lakeland, FL, recently broke ground on its new School of Physical Therapy, a stunningly designed facility that will supply highly trained physical therapists to healthcare facilities in central Florida and beyond. The new Schoolwill be strategically located on South Florida Avenue in Lakeland, less than a mile from FSC’s main campus.

Southern Florida

Renovation and construction work is underway on an existing 6,500-square-foot building, with an 11,000-square-foot addition to come. The structure will be a great addition to the Dixieland corridor, a historic district in Lakeland. Scheduled to open in August 2019, the building will include faculty offices, classrooms, and a state-of-the-art lab.

The architect on the project is Wallis Murphey Boyington Architects, with construction work to be completed by Rodda Construction. Mike Murphey, WMB partner with ROI Solutions, said the building’s design is inspired by the work of architect Frank Lloyd Wright, notably including elements reminiscent of the colored-glass “textile blocks” Wright incorporated into his designs for the Florida Southern campus.

Featured

  • Hawaii Elementary School Breaks Ground on New Classroom Building

    Kealakehe Elementary School in Kailua, Hawaii, recently began construction on a new, $16-million classroom building for its campus, according to a news release. The 13,000-square-foot building will stand two stories and connect the existing upper and lower campuses.

  • Countway Library at Harvard Medical School

    From Shadows to Sanctuary: The Transformation of Light at Countway Library

    The renovation of Countway Library at Harvard Medical School demonstrates how biophilic design and advanced lighting strategies transformed a formerly dark, insular space into a vibrant, welcoming hub that supports wellness, learning, and community engagement.

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • North Texas School District Completes Third New Elementary School

    The Denton Independent School District in Dallas, Texas, recently finished construction on its third prototype design elementary school, Reeves Elementary, according to a news release.