University of Iowa Constructing Psychological and Brain Sciences Building

Construction is underway on the campus of the University of Iowa (UI) in Iowa City for a facility that will be the new home of UI’s Department of Psychological and Brain Sciences.

Iowa Brain Science

The new $33.5 million, 66,470-square-foot building will include 70-student and 30-student classrooms that can be combined for use as high-tech TILE (spaces to Transform, Interact, Learn, and Engage) classrooms.

With 15 cutting-edge labs for human research, the building will be better equipped for faculty and graduate and undergraduate students to conduct research. The labs will be clustered by areas of research to promote collaboration and interaction and will, with its new family waiting area, provide a more “welcoming and friendly environment” for parents with children who are waiting to taking part in research projects.

Completion is tentatively set for summer 2019.

Featured

  • Ancient Resilience: How Indigenous Intelligence Shapes the 4Roots Education Building

    As climate change intensifies, educational spaces must evolve beyond basic sustainability toward true resilience – we must design environments that can adapt, respond, and thrive amid shifting, and intensifying, climate hazards. Drawing on indigenous wisdom and nature-based strategies, integrating resilient design offers a path to create learning environments that are not only functional but deeply in tune with their natural surroundings.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • New Jersey PreK–12 School Breaks Ground on New STEM Building

    Saddle River Day School (SRDS) in Saddle River, N.J., recently announced that it has broken ground on the new Dr. Kristen Walsh Hall of Science & Entrepreneurship, according to a news release. The school partnered with DIGroup Architecture for the design of the new facility, which will provide the school with space to expand its STEM and business education classes.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

Digital Edition