Student Union Renovation Begins at UMass Amherst

The Student Union building on the campus of the University of Massachusetts, Amherst, closed for renovation in January. The renovation has been designed by Shepley Bulfinch.

When the building reopens for the fall 2020 semester, most interior walls will have been removed and the interior generally repartitioned. The ballroom, now on the main floor, will be one floor higher and feature exposed columns and trusses.

UMASS Student Union

Students will find an active “Main Street” style promenade with concentrated retail, student services, and dining options, and there will be a new entry and outdoor plaza with a streamlined connection to the Lincoln Campus Center. Other renovations include:

  • A consolidated media center serving the Daily Collegian, UVC-TV19, and WMUA that is positioned so activity is visible from the “Main Street.”
  • Expanded student business space.
  • New meeting, activity, and assembly space.
  • Cape Cod Lounge will be repurposed into new, divisible, multipurpose areas for medium-sized assembly and function space.
  • Mechanical and electrical systems will be updated.

Featured

  • iPark 87

    Building a Future-Focused Career and Technical Education Center

    A district superintendent shares his team's journey to aligning student passions with workforce demands, and why their new CTE center could be a model for districts nationwide.

  • Abstract tech network data connections with orange, blue glowing dots, lines

    3 Trends for Higher Education to Stay Ahead of in 2026

    As universities enter the new year, the question is no longer whether digital transformation is necessary, but how quickly institutions can convert technological potential into strategic advantage.

  • Texas State University Completes Stadium Renovations

    Texas State University in San Marcos, Texas, recently announced that it has completed a series of additions and renovations to its football stadium, according to a news release. Formerly known as the Bobcat Stadium End Zone Complex, the Johnny and Nathali Weisman Football Performance Center is an 85,000-square-foot expansion featuring hospitality spaces, banquet spaces, exterior concourses, and upgrades to the field house.

  • Armstrong World Industries Acquires Parallel Architectural Products

    Armstrong World Industries, provider of interior and exterior architectural applications, recently announced that it has acquired the Colorado-based Parallel Architectural Products, according to a news release.

Digital Edition