Student Union Renovation Begins at UMass Amherst

The Student Union building on the campus of the University of Massachusetts, Amherst, closed for renovation in January. The renovation has been designed by Shepley Bulfinch.

When the building reopens for the fall 2020 semester, most interior walls will have been removed and the interior generally repartitioned. The ballroom, now on the main floor, will be one floor higher and feature exposed columns and trusses.

UMASS Student Union

Students will find an active “Main Street” style promenade with concentrated retail, student services, and dining options, and there will be a new entry and outdoor plaza with a streamlined connection to the Lincoln Campus Center. Other renovations include:

  • A consolidated media center serving the Daily Collegian, UVC-TV19, and WMUA that is positioned so activity is visible from the “Main Street.”
  • Expanded student business space.
  • New meeting, activity, and assembly space.
  • Cape Cod Lounge will be repurposed into new, divisible, multipurpose areas for medium-sized assembly and function space.
  • Mechanical and electrical systems will be updated.

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Photo credit - Chuck Coates

    Florida District Modernizes Central Energy Plants at Two High Schools

    Flagler Schools, a public school district in Flagler County, Fla., recently partnered with Matern Professional Engineering to modernize the central energy plants at two of its high schools, according to a news release. The project is part of a larger, district-wide effort to reduce energy costs and operational expenses.

  • New Arizona Fine Arts School Reaches Construction Milestone

    Construction of the new Hilltop School for the Arts and Theater in Litchfield Park, Ariz., recently hit a significant milestone, according to a news release. The Agua Fria High School District held a beam-signing ceremony to celebrate the building’s topping out, or the placement of its last structural beam.

  • Photo credit: Elkus Manfredi Architects

    University of Virginia Selects Design-Build Team for New Residential Complex

    The University of Virginia in Charlottesville, Va., recently announced that it has selected a design-build team for a new upper-class residential development on campus, according to a news release. Capstone Development Partners—in partnership with Elkus Manfredi Architects and the Hoar Construction/Hourigan construction team—will move forward with the three-building, 310,000-square-foot housing facility.