California College of the Arts Breaks Ground on New On-Campus Student Housing

In February, California College of the Arts (CCA) broke ground on new student housing in San Francisco. Designed by leading architecture firm Stanley Saitowitz | Natoma Architects Inc., the five-story building will provide much-needed, below-market-rate housing for more than 500 students—roughly 25 percent of CCA’s student body—upon its completion in 2020. The 280 rooms are CCA’s first on-campus housing in San Francisco and are positioned at the center of the school’s expanding campus.

CCA Hooper Student Housing

The building will primarily provide housing to the school’s first- and second-year students. It will include single- and multiple-occupancy units and more than 12,000 square feet of common areas, along with social and study spaces. An inviting, sunlit café on the ground floor of the building will be surrounded by floor-to-ceiling glass windows.

At the ground level, the facility includes 10,000+ additional square feet of outdoor space with landscaped, interconnected courtyards. The building also features a 400-square-foot outdoor deck on the fifth floor. The sidewalk outside the building will expand to accommodate an increase in foot traffic and landscaping. Crosswalks will be added, giving the neighborhood a more residential feel.

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.