IUPUI to Construct New Classroom Building

INDIANAPOLIS, IN – Indiana University–Purdue University Indianapolis (IUPUI) will soon begin construction on its newest building, the Multidisciplinary Research and Classroom Building (MRCB). The Indiana University Board of Trustees approved the architectural design for the building, to be located at the eastern edge of campus, in October 2018.

IUPUI classroom building

The MRCB is an adaptable facility that will meet evolving teaching and research needs for programs in the School of Science, the School of Engineering and Technology, and the School of Informatics and Computing. It will include a state-of-the-art interdisciplinary research and lab space, a cleanroom environment, a makerspace, and modernized classrooms and collaborative learning spaces.

The first floor will be home to three major classrooms, as well as an informal student lounge and seating area. The classrooms include a 215-seat tiered lecture hall, an 81-seat active learning space with movable chairs and tables, and a 125-seat active learning space where the faculty member is in the middle. Shaped like a football, that space has two tiers of seats that swivel to encourage collaboration. The second and third floors will contain engineering and science labs, as well as more classrooms.

Construction is expected to finish in August 2020.

Featured

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.

  • Montclair State University Starts Construction on $120M STEM Building

    Montclair State University in Montclair, N.J., recently broke ground on a new $120-million Interdisciplinary Science Building, according to university news. The university partnered with HoK Architects for the project’s design, and it’s scheduled to open in time for the 2028–29 academic year.

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • Minnesota District Converts Middle School into Community Hub

    White Bear Lake Area Schools in White Bear Lake, Minn., recently announced the end of a major renovation project that converted a former middle school into a new centralized district and community hub, according to a news release.