Kansas City Art Institute Breaks Ground on Paul and Linda DeBruce Hall

KANSAS CITY, MO – The Kansas City Art Institute (KCAI) broke ground in April on an 18,000-square-foot, $30-million building, the Paul and Linda DeBruce Hall. Designed specifically for art history, creative writing, entrepreneurial studies, liberal arts, and student services, Paul and Linda DeBruce Hall will impact every student at the college and will elevate the profile of KCAI’s academic programs in a state-of-the-art facility.

Kansas City Art Institute

A unique architectural feature of the Hall will be the entry portal. Visitors will enter through a portal adorned with panels, each engraved with the name of influential art historians of the past and present. The entrance will become a tribute to the individuals who have interpreted and written about art and artists for future generations.

The Hall is designed by Kansas City-based architecture firm Hufft. Award-winning landscape architects Hoerr Schaudt will design the expansive outdoor spaces and Kansas City construction company McCownGordon will build the facility.

Construction is expected to finish in August 2020.

Featured

  • Wold Architects & Engineers Acquires VPS Architecture

    Full-service planning, architecture, and engineering firm Wold Architects & Engineers recently announced that it has acquired VPS Architecture, according to a news release. The move will help strengthen Wold’s education and public-sector design expertise, industries in which both companies have strong pre-existing ties and relationships.

  • A digital silhouette works at a computer, immersed in a glowing, interconnected world

    How Will AI Transform Learning Space Design?

    For years, higher education has designed learning spaces around technology as a tool for display, capture, collaboration, and connectivity. AI changes that equation.

  • Benson Polytechnic High School in Portland, OR

    Preserving Legacy, Designing for the Future

    As historic academic buildings age, institutions face a difficult decision: preserve and adapt or demolish and rebuild. How do we honor the legacy of these spaces while adapting them to meet the needs of modern learners?

  • Image courtesy of Kahler Slater

    UW–Madison Announces Completion of Morgridge Hall

    The University of Wisconsin–Madison recently announced that construction is complete on Morgridge Hall, a new academic building, according to a news release. The facility opened September 3 at the start of the fall semester, consolidating the School of Computer, Data & Information Sciences into a single facility for the first time.