University of Vermont Set to Construct New Multi-Purpose Center

BURLINGTON, VT – Ground was broken recently on the University of Vermont’s (UVM) new Multi-Purpose Center.

University of Vermont Multipurpose

The Multi-Purpose Center project will bring substantial changes to the 55-year-old Patrick-Forbush-Gutterson Athletic Complex. Project highlights will include the construction of the new Tarrant Center, which will be home to UVM’s men’s and women’s basketball programs, as well as host a variety of academic, social, cultural, and entertainment programming. There will also be a major renovation of historic Gutterson Fieldhouse, and the creation of a three-story shared space between that facility and the Tarrant Center. This part of the facility will feature spacious concourses with restrooms and concessions, simplified circulation, and a well-appointed Victory Club room with spectacular views into both Gutterson and the Tarrant Center.

Beyond the improvements for varsity athletes, teams, and fans, the Multi-Purpose Center will become the hub for recreation, wellness, and fitness for the entire UVM campus thanks to dramatic upgrades and a five-fold increase in the space dedicated for health, wellness, and recreational use. Enhancements will also include study areas and lounges that will support the academic and social objectives of the Department of Athletics and the other university units that use the facility.

Featured

  • Porter Family Center

    Porter Family Center for Innovation and Academics

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Porter Family Center for Innovation and Academics has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.

  • GeoCam and UCLA: Modernizing Campus Accessibility Mapping

    In early 2025, UCLA partnered with GeoCam to capture and modernize its pedestrian infrastructure data. The goal was ambitious but clear: to produce a high-accuracy, imagery-backed digital map of every sidewalk, pathway, ramp, and ADA-related feature on UCLA’s 419-acre campus.

  • California Middle School Breaks Ground on Major Renovation Project

    The Hillsborough City School District (HCSD) in Hillsborough, Calif., recently began construction on new multipurpose and administration facilities for Crocker Middle School, according to a news release.

  • Architectural Power for the Modern Campus Landscape

    For generations, an outdoor classroom only required a textbook and a patch of grass. Today, not only has the laptop replaced the printed pages, the rise of agile learning has turned campuses into study halls with students listening to lectures and researching topics from quads, gardens, and plazas. The challenge for architects and facility managers is to provide connectivity without cluttering the landscape with visual eyesores or creating safety hazards with extension cords.