New Dental Clinic Opens at Case Western Reserve University

CLEVELAND, OH – The Case Western Reserve University School of Dental Medicine and Cleveland Clinic opened their new, larger dental clinic on campus here earlier this month. More easily accessed by patients, it will expand opportunities for education and research, enhance the patient experience, and support the health and well being of Cleveland-area residents.

Case Western Dental Clinic

The three-story, 132,000-square-foot facility is the second building of the Health Education Campus (HEC), a joint effort between Case Western Reserve and Cleveland Clinic designed to promote collaborative practice and lifelong learning among health care professionals. It is located directly across from the HEC centerpiece, the Sheila and Eric Samson Pavilion; dedicated in April, the Samson Pavilion serves the more than 2,200 students in the university’s nursing, dental, and medical schools, with students from the social work school joining them for some classes as well.

The dental clinic was designed by DLR Group│Westlake Reed Leskosky of Cleveland. Kahler Slater of Milwaukee provided programming, planning, and interior architectural services.

The clinic includes procedure spaces for general and specialty dentistry and dental surgery, support labs, clinical research environments, 3D computer-aided design and manufacturing (CAD/CAM) lab equipment, imaging equipment, and central sterilization. Clinical spaces are designed to allow flexibility while maintaining patient confidentiality and privacy. Natural light is filtered throughout the building, further enhancing the patient experience.

Featured

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

Digital Edition