$58 Million New Campus Construction in the Works for Residential STEM High School

A North Carolina residential STEM high school has broken ground on its second campus.

The North Carolina School of Science and Mathematics is expected to open a western campus in Morganton in August 2021, adding to the original campus located in Durham.

According to news reports, the facility will be about 211,000 square feet and will include existing buildings from the previous school that was on the site that have been renovated along with new construction. Plans are for 300 students from across the state to reside at the school, most, if not all, juniors and seniors. A bond package passed by voters in 2016 provided the project with $58 million, which has an estimated project budget of $73 million.

A 2017 "educational program vision" for the new school stated that students "will develop knowledge, habits of mind, skills and dispositions from mathematics, science, engineering, computer science and the humanities" in experiences "oriented toward s preparing [them] to respond to opportunities and challenges in a changing world." The curriculum will include data science and artificial intelligence. Learning will provide real-world experiences, as well as student research and mentorships. And recruitment will emphasize identifying and recruiting prospective students from underrepresented communities.

"Expansion to Western [North Carolina] will give even more students the opportunity to discover their interests and talents, to prepare to lead, serve, and tackle the challenges faced by our state, our nation, and our world," NCSSM Chancellor, Todd Roberts, told supporters in a recent letter.

NCSSM, which claims to be the first public residential high school in the country specializing in STEM, is approaching its 40th anniversary and has served as a model for similar schools, many of which now make up the membership of the National Consortium of Secondary STEM Schools.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

  • California High School Starts Construction on New CTE Building

    Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking.

  • modern college building with circuit and brain motifs

    Anthropic Introduces Claude for Education

    Anthropic has launched a version of its Claude AI assistant tailored for higher education institutions. Claude for Education "gives academic institutions secure, reliable AI access for their entire community," the company said, to enable colleges and universities to develop and implement AI-enabled approaches across teaching, learning, and administration.

Digital Edition