Ohio School System Adds Rooftop Solar Field

Federal Hocking Local Schools had a "grand 'turn on'" of its new solar power plant. Now, 1,968 solar panels installed on the roof of the joint middle and high school building will provide energy to the Ohio school system.

The solar system is expected to generate about 700 kilowatts of renewable energy annually, which will cover about 70 percent of the building's energy needs during the year. The project was contracted to Third Sun Solar.

In local reporting, the project was promoted as a way to cut the cost of energy, reduce carbon footprint and teach students about the renewable energy industry.

Early in the project, Superintendent George Wood explained how funding the system worked: An outside company would own the plant and the school district would "buy energy from them at a reduced cost." The district also invested $400,000 from its reserve account to reduce the cost of the electricity it would be purchasing and to "speed up the buy-back option on the plant." By doing so, said Wood, "we will see reduced annual costs, accelerate our path to ownership and have more money for annual expenses."

He also suggested during the official launch that other schools should take the same route. "You’re generating cheap, clean energy. You’re getting an educational benefit from kids and you’re being a good steward of public resources. Seems to me it’s a win-win solution for everyone," he said.

Eventually, the school community will be able to track the energy produced by the site through an online dashboard that displays current power and energy generated for the day, month and lifetime of the installation.

Research by the Solar Foundation reported that the state of Ohio had 45 schools that have "gone solar."

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • California High School Starts Construction on New CTE Building

    Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking.

  • AP Construction Breaks Ground on Two Projects for Austin ISD

    Adolfson & Peterson Construction (AP) recently announced that it has broken ground on two renovation projects for the Austin Independent School District, according to a news release. The work at McCallum and Anderson High Schools totals 97,350 square feet and is scheduled for completion in January 2027.

  • ECM Technologies Wins ‘Most Innovative Business of the Year’ Award

    HVAC preventative maintenance and efficiency solutions provider ECM Technologies was recently named the “Most Innovative Business of the Year” at the 2025 Champions of Change Awards, according to a news release. The program recognizes Arizona business leaders and organizations taking steps to make a positive impact on the state through innovative thinking and philanthropy.

  • Wisconsin District Launches Series of Improvement Projects

    The School District of River Falls in River Falls, Wis., recently launched a series of five construction projects scheduled for completion by September 2025, according to a news release. The district partnered with Bray Architects for their design and with integrated construction management firm Kraus-Anderson (KA) for their construction.

Digital Edition