NH CTE Center Gets 25 million Makeover

Officials recently broke ground on a technical school rebuild in Hudson, NH. The Wilbur H. Palmer Career and Technical Education Center, based in Alvirne High School, offers 17 programs of study. Students bus in from 15 other high schools to take part in programs on computer science, digital media, health science and technology and pre-engineering, among others. The center also runs several businesses that are open to the school community, including a convenience store, a restaurant, a preschool and a greenhouse and flower shop.

The new center will include 38,000 square feet of new construction as a first phase. Subsequent phases will encompass interior renovations covering 47,000 square feet.

Among the new additions, according to local reporting, will be a media studio, automated manufacturing and metal fabrication facilities, expansions to computer science and health science programs, and a culinary arts program that’s integrated with the finance and marketing programs.

The project is estimated to cost $25 million, with $8.2 million coming from local tax sources and $17 million from the state. However, material cost escalation and a labor shortage that cropped up when new building starts escalated in the state have led to construction delays and budget overruns. Right now, the project faces a possible $2.5 million shortage in state funding. However, the district said it hopes to resolve the funding shortfall over the next 18 months.

The center is named after the late Wilbur Palmer, who as vocational director at the high school spent two decades promoting the idea of constructing a dedicated vocational center. That finally received state funding in 1991 and opened in 1992.

The school is being built by Harvey Construction in Bedford and designed by Lavallee Brensinger in Manchester.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

  • California High School Starts Construction on New CTE Building

    Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking.

  • modern college building with circuit and brain motifs

    Anthropic Introduces Claude for Education

    Anthropic has launched a version of its Claude AI assistant tailored for higher education institutions. Claude for Education "gives academic institutions secure, reliable AI access for their entire community," the company said, to enable colleges and universities to develop and implement AI-enabled approaches across teaching, learning, and administration.

Digital Edition