Delivering Around-the-Clock Power

gas generator

To ensure the power is always on, the Edward Via College of Osteopathic Medicine installed a Cat G3412 gas generator to back up the utility feed at the Auburn, AL, campus.

On a branch campus of Virginia Tech in Auburn, AL, the Edward Via College of Osteopathic Medicine (VCOM) opened its doors with a vision to provide healthcare for nearby underserved regions while promoting biomedical research. In a state-of-the-art building on the southern end of the Auburn campus, more than 325 VCOM first-and second-year students are taught the fundamentals of osteopathic medicine. VCOM’s curriculum is based on a digital platform so continuous power is critical.

To ensure uninterrupted power, VCOM installed a Cat G3412 gas generator to back up the utility feed at their Auburn campus when the building first opened. Based on a recommendation from Cat dealer Thompson Tractor, VCOM transfers the electrical load to the facility once a month.

“Every time, the generator has kicked right in and done what it’s supposed to do,” says Randy Cerovsky, facilities director for VCOM-Auburn. “We have never noticed any delay in the amount of time it takes for the generator to start up and transfer the power over. Everything just runs smoothly; we’ve never had any issues.”

Technicians from Thompson Power Systems perform regular maintenance on the generator set. “Thompson Power Systems has been great to work with,” Cerovsky says. “They do all of the service, and they explain everything.”

Cerovsky receives email alerts when the generator runs or if issues arise. “One of the features I like is the Cat Connect interface that enables us to receive SMTP alerts so if anything’s wrong, we get notified and call to receive service immediately.”

www.cat.com/en_US

This article originally appeared in the College Planning & Management September 2019 issue of Spaces4Learning.

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.