Madison SD Installs Electronic Door Locks, Internet-Based Phones to Enhance Safety

Madison Metropolitan School District installed electronic locks and internet-based phones with increased functionality as part of an upgraded district-wide security plan.

The $6.5 million security plan was partially funded by a grant program the Wisconsin state government established last year in a response to a mass shooting at a Florida High school. Madison was awarded $1 million in the first round of funding and $1.5 million in the second round. The rest of the plan was covered by local funds.

More than 4,600 locks have been swapped out across the district. The electronic locks — which are controlled by staff ID badges — automatically locks people from coming in a room once the door is closed, unless they have a badge.

About 4,100 new phones have been put in all schools but the software that increases the phone’s capabilities will be installed throughout the fall semester. Once added, the phones will be able to page an individual classroom through the PA system and send out emergency notifications to families.

“This new phone system gives us a ton of flexibility and functionality because it is run over the internet,” director of building services, Chad Wiese told a local newspaper.

In addition, the school district is adding more than 400 cameras and window-hardening film to main entrances of schools, designed to slow down active shooters.

In order to receive the grant funding from the state, teachers needed to complete associated safety training. The district also trained staff and teachers on new standardized emergency response procedures.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Geometric abstract school illustration

    How Design Shapes Learning and Success

    Can the color of a wall, the curve of a chair, or the hum of fluorescent lights really affect how a student learns? More schools are beginning to think so.

  • Rhode Island Boarding School Completes Student Dorm Renovations

    St. George’s School in Middletown, R.I., recently announced the completion of a $26-million renovation project on Arden-Diman-Eccles Dormitory, according to a news release. The school partnered with Voith & Mactavish Architects (VMA) on the new space, which places a new focus on collaborative community spaces open to both boarding students and day students.

  • Image courtesy of Kahler Slater

    UW–Madison Announces Completion of Morgridge Hall

    The University of Wisconsin–Madison recently announced that construction is complete on Morgridge Hall, a new academic building, according to a news release. The facility opened September 3 at the start of the fall semester, consolidating the School of Computer, Data & Information Sciences into a single facility for the first time.

  • Kimball International Releases Curated Design Support Program

    Commercial furnishings company Kimball International recently announced the launch of a new end-to-end design support program, DesignSuite. According to a news release, its goal is to guide architecture & design professionals and dealer partners through the process from vision to specification.