New Minnesota High School Features Industrial Tech Spaces

Minnesota’s Menahga High School opened its doors this week, while construction continues in a few areas of the school like the gym and the kitchen. The school is scheduled to be fully completed in October.

The two-level building is brightly lit with numerous windows and an open-air commons area.

“There’s so much natural light coming in,” Ashley Bachmann, a math teacher at the school, said. “I like all the different work spaces they’ve created, with tables and chairs. I think that’s so cool. It’s such a neat idea for kids to work versus just the classroom.”

The high school will feature state-of-the-art science labs, a metal shop with 10 welding stations and an industrial tech shop with small engine and small projects space. Principal Mark Frank told a local newspaper that the long-term goal is to assemble student teams who design and build their own ice-fishing houses.

The new gym scoreboard uses the same software as U.S. Bank Stadium. Students will be able to create graphics, like photos of the team lineups, for the new scoreboard.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Fayetteville State University Opens New Residence Hall

    Fayetteville State University (FSU) in Fayetteville, N.C., recently completed construction on a new $50-million residence hall, according to a news release. The university partnered with KWK/Jenkins • Peer Architects on the design of Bronco Pride Hall.

  • University of Southern Mississippi Starts Construction on Oyster Hatchery

    The University of Southern Mississippi (USM) recently announced that construction has begun on a new oyster hatchery at its Gulf Coast Research Laboratory (GCRL) Thad Cochran Marine Aquaculture Center (TCMAC) Cedar Point campus in Ocean Springs, Miss., according to a news release.

  • North Texas School District Completes Third New Elementary School

    The Denton Independent School District in Dallas, Texas, recently finished construction on its third prototype design elementary school, Reeves Elementary, according to a news release.

  • Image credit: O

    Strategic Campus Assessment: Moving Beyond Reactive Maintenance in Educational Facilities

    While campuses may appear stable on the surface, building systems naturally evolve over time, and proactive assessment can identify developing issues before they become expensive emergencies. The question isn't whether aging educational facilities need attention. It's how institutions can transition from costly reactive maintenance to strategic asset management in a way that protects both budgets and communities.

Digital Edition