Why should we install waterless urinals?

Determining the need for waterless urinals depends on the number of males using the building. Also, if new construction or a restroom renovation is involved. If new construction, there are few reasons not to install no-water urinals. If a retrofit, and 10 or fewer males use the facility, the return on the investment may not prove worthwhile at this time. But with rising water and sewer rates, reconsideration may be necessary at a future date.

When looking at installation and maintenance costs, no-water urinals usually cost less to install than traditional fixtures because no flush valves or water lines are involved. Overall, the return on investment can vary, depending on the number of users, water and sewer rates, and the age of the urinals. Waterless urinals range in price from $250 to $500 per unit. In most cases, the return on investment is about two years or less.

If you are concerned with odor issues, most waterless urinals have cartridges installed in the base of the fixture. Filled with barrier fluids, these cylinders suppress odors and block vapors. Proper cleaning will help prevent odors. Be aware that some cartridges are costly and must be replaced fairly often, but others are relatively inexpensive and last longer. Investigate the different systems available before selecting your waterless urinals.

Also, if sustainability is an objective, installing waterless urinals can earn you LEED points. The LEED rating system offers up to five points (out of approximately 32 required) toward certification for buildings that incorporate measures to reduce water usage. Installing waterless urinals is often one of the easiest and most significant ways to accomplish this.

This article originally appeared in the College Planning & Management October 2019 issue of Spaces4Learning.

About the Author

A frequent speaker and author on water conservation issues, Klaus Reichardt is founder and CEO of Waterless Co. Inc.(www.waterless.com), based in Vista, CA. Reichardt founded the company in 1991 with the goal to establish a new market segment in the plumbing fixture industry with water efficiency in mind. The company manufactures restroom and plumbing-related products.

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.