TAMU Plant Pathology and Microbiology Building Opens

COLLEGE STATION, TX – An initiative begun during the 2012-2013 academic year led Texas A&M University’s (TAMU) College of Agriculture and Life Sciences to declare five grand challenges of agriculture. Three of those—“Feeding Our World,” “Improving Our Health,” and “Protecting Our Environment”—were specifically called out by Sandy Pierson, professor and head of the Department of Plant Pathology and Microbiology, during the groundbreaking ceremony for the Plant Pathology and Microbiology Building two years ago. Now, with the building’s official grand opening in late October, the department can enhance its collaborative efforts with the Institute for Plant Genomics and Biotechnology (IPGB) and other College of Agriculture and Life Sciences departments, including Entomology, Horticulture, Soil and Crop Sciences, Biochemistry and Biophysics, Ecosystem Sciences and Management, and Wildlife and Fishery Sciences.

Texas A&M Plant Pathology 200

The new building provides generic, flexible labs with the capabilities necessary to support research as it evolves. Its 84,000 square feet includes two plant pathology instructional labs, one bio-environmental instructional lab, teaching support spaces, 20 general research spaces with associated support areas, an integral greenhouse, two multipurpose seminar rooms, one multipurpose flat-floor auditorium, and administrative offices. Its placement adjacent to the Horticulture/Forest Science Building, and near other related research departments and facilities, strengthens and enhances opportunities for cross-disciplinary collaboration among faculty and students.

The building, which will serve as the new home of the Department of Plant Pathology and Microbiology as well as the Bioenvironmental Sciences (BESC) program, was planned and designed by Flad Architects in collaboration with architect of record Randall Scott Architects.

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.