Santa Barbara School District Approves Renewable Energy Project

The Santa Barbara Unified School District unanimously approved a plan for a new energy initiative at its last school board meeting, reported the Santa Barbara Independent. If completed, the district will install solar energy, battery storage, and electrical vehicle charging stations at school sites districtwide.

With an increase in natural disasters and public safety power shutoffs in Santa Barbara, the district is considering a renewable energy infrastructure that would allow district schools to serve its community during emergencies. Community members would be able to come to school sites to charge devices, eat and store perishable foods, and if needed during an evacuation, the schools would be able to power the site for 3-5 days.

The school board approved the first six steps of this renewable energy project. The steps involved partnering with two environmental firms — Clean Coalition and Sage Energy Consulting — to complete a feasibility study by June 2020. If the project is financially feasible, the district will negotiate a power-purchase agreement with the firms, move forward with construction, and have all infrastructure and systems running by 2022.

The Clean Coalition has been designing community microgrids, which are like smaller versions of the electric grid but “can serve entire communities by providing indefinite renewables-driven resilience to the most critical community loads — and serve all loads for significant portions of time.” The project includes 18 prospective solar-driven microgrid and electric vehicle charging stations throughout the district.

The initial project management costs involved in the first six steps is $287,900 and is being paid from the State Facility Grant Matching funds.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Thomas F. Frist, Jr. College of Medicine

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Thomas F. Frist, Jr. College of Medicine has been recognized with an EDS 2025 Project of Distinction award in the category of New Construction.

  • KnowBe4 Releases Report on Education Sector’s Preparedness for Cyberattacks

    Cybersecurity platform KnowBe4 recently released a new research report titled “From Primary Schools to Universities, The Global Education Sector is Unprepared for Escalating Cyber Attacks,” according to a news release.

  • Mesa West Capital Provides Loan to Refinance University of Georgia Residence Complex

    Mesa West Capital recently announced that it has provided a $133.9-million, short-term, first mortgage loan to developer LV Collective (“LV”) to refinance a student housing complex near the University of Georgia, according to a news release. Rambler Athens, a 750-bed residence hall adjacent to the campus, was completed in August 2024.

  • College of the Mainland Starts Construction on New Library & Learning Center

    College of the Mainland in Texas City, Texas, recently held a groundbreaking ceremony for its new Library & Learning Center, according to a news release. The new facility is part of a larger, $250-million campus expansion project funded by a 2023 bond program.

Digital Edition