Preschool in Conn. Opens Makerspace

The United Methodist Preschool (UMPS) in New Canaan, CT recently held a public open house of their newly completed makerspace. The makerspace enhances their STEAM-based curriculum.

The makerspace provides children ages 3-5 with a space for making, learning, exploring, and sharing. “Through tinkering (using stuff), making (using stuff to make stuff), and engineering (using stuff to make stuff that does stuff), children are engaged in the same creative processes and actions that engineers and scientists use,” read a statement on the school’s website.

“The new space will enable the children to create, explore in-depth, and work on long-term projects,” UMPS board member Margaret Pastel told the New Canaan Advertiser. “This is unique as most preschool projects are often completed in one day and rarely returned to. In the Makerspace, children will construct, improve, dismantle, imagine and redesign long-term projects, fostering creativity and higher-level thinking skills.”

The preschool is the first preschool to receive accreditation through The National Association for the Education of Young Children.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Recent University of Pennsylvania Projects Receive LEED Certifications

    The University of Pennsylvania in Philadelphia, Penn., recently announced that three of its recent construction projects have earned LEED certifications, according to university news. The Vagelos Laboratory for Energy Science and Technology (VLEST) received a LEED Platinum certification, Amy Gutmann Hall a LEED Gold, and the OTT Center for Track and Field a LEED silver.

  • FAU Starts Construction on Holocaust and Jewish Studies Building

    Florida Atlantic University recently began construction on a new academic building for its campus in Boca Raton, Fla., according to university news. The Kurt and Marilyn Wallach Holocaust and Jewish Studies Building will stand two stories, measure in at 22,000 square feet, and play home to the university’s Holocaust education and Jewish studies programs.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • Creating Long-Term Sustainability on College Campuses Through Fair Student Housing

    The quality of student housing can have a significant impact on an individual’s college experience. Today’s higher education institutions face mounting challenges, including declining enrollment, low retention rates between the first and second years, and a rise in student mental health concerns. Thoughtfully designed living spaces can help address these issues by creating environments that promote both academic focus and personal well-being.

Digital Edition