Gov. Gary Herbert approved the Utah State Board of Education’s requirements and recommendations for reopening schools in the state. As per the requirements, all Utah public schools must have reopening plans in place and posted online by August 1.

The plans must address:

  • Repopulating Schools (which includes communication and training, accommodating individual circumstances, enhanced environment hygiene & safety, and school schedules.)
  • Implementation of Mitigation Actions in School Settings (e.g., Classrooms, Transitions, Office Spaces, Transportation, Restrooms, Cafeterias)
  • Monitoring for Incidences
  • Containing Potential Outbreaks
  • Temporarily Reclosing (if necessary)

“We will be digitally meeting with local school leaders throughout the state shortly to provide tools for applying appropriate principles and levers to mitigate risk of spread in school-specific settings,” said State Superintendent of Public Instruction Sydnee Dickson in a statement. “We have innovative problem solvers working in our public schools and we will work with districts and charter schools as they create their plans to keep our students and staff safe this coming school year.”

Some of the requirements schools must implement include:

  • Education and training for faculty and staff on school’s protocol and action plans
  • A process for students and families and staff to identify as high risk to COVID-19 and have a plan in place for alternative learning arrangements if needed
  • An increased cleaning and hygiene regimen
  • Faculty and staff must wear face coverings when physical distancing is not feasible
  • Hand sanitizer, disinfecting wipes, soap and water must be readily available
  • A designated quarantine room to temporarily house students who are unable to return home

USBE has provided a handbook and template for schools to use while developing local plans. The board will update the handbook as further research, data, and resources become available. For updated information, visit www.schools.utah.gov/coronavirus.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • University of Connecticut Upgrades Basketball Facility’s AV Systems

    The University of Connecticut recently partnered with Metinteractive to upgrade the AV systems of the Gampel Pavilion basketball facility on its campus in Mansfield, Conn., according to a news release.

  • bar graph with the bars made out of abstract cinder blocks and other construction materials

    Spaces4Learning 2025 Trends in K–12: Materials & Construction

    With 2025 well underway, it’s time to take a look at some broader trends submitted by you, our Spaces4Learning readership. We asked for your thoughts on topics like classroom design, health & safety, materials & construction, and technology in both K–12 and higher-education environments. Below is a roundup of 2025 trends in K–12 materials and construction from the experts in the trenches.

  • Georgia High School Debuts 500-Seat Esports Arena

    Cass High School in Bartow County, Ga., recently announced the opening of a new, 7,000-square-foot Esports Arena, according to a news release. The Bartow County School System partnered with Extron AV Technology on the project.

  • Greenheck Receives Sourcewell Cooperative Contract

    Air movement, control, conditioning, and distribution equipment solutions provider Greenheck recently announced that it has been awarded a Sourcewell cooperative purchasing contract, according to a news release. The HVAC Systems contract will allow Greenheck the opportunity to expand opportunities in government procurement and other public agencies in North America.

Digital Edition