Cleaning Robot Pitched for Classrooms

Imagine a Roomba with a plastic pillar on top, roaming through a room dispensing disinfectant onto chairs, table-tops and other surfaces. That's the latest product from CIRQ+, a start-up that launched by producing a room cleaning system for the hospitality segment. Now the company has turned its attention to classrooms with the release of the CIRQ+ Clean.

As it moves throughout the room, the cbot sprays a cleaning agent that, according to the company, is effective against SARS CoV-2, the novel coronavirus that generates COVID-19, as well as other pathogens.

Described as a smart "cbot," or cleaning robot, the unit is controlled by an in-room hub. As it moves throughout the room, the cbot sprays a cleaning agent that, according to the company, is effective against SARS CoV-2, the novel coronavirus that generates COVID-19, as well as other pathogens.

In a video about the system, the company said the chemical used was "EPA-registered and CDC-approved"; safe for use around adults, children and pets; and safe on fabrics, clothing and other materials.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • UCNJ Launches $30M Modernization of Physical Education Center

    The Union College of Union County (UCNJ) in Cranford, N.J., recently broke ground on a new $30-million modernization project for its Physical Education Center (PECK), according to a news release. The college partnered with DIGroup Architecture for the project’s design, transitioning the existing 42,000-square-foot structure into a campus hub for student athletics and campus life.

  • Geometric abstract school illustration

    How Design Shapes Learning and Success

    Can the color of a wall, the curve of a chair, or the hum of fluorescent lights really affect how a student learns? More schools are beginning to think so.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • Minnesota Middle School Finishes $23.5M Addition and Modernization

    Highland Park Middle School in St. Paul, Minn., recently announced the completion of a $23.5-million addition and remodel project, according to a news release. Saint Paul Public Schools partnered with ATS&R Planners, Architects & Engineers for its design and Kraus-Anderson for its construction.

Digital Edition