College of the Redwoods Approves Solar Deal

A community college in northern California has projected a savings of $4.2 million over the next 20 years from an implementation of solar. The College of the Redwoods Board of Trustees recently approved a proposal from ForeFront Power to install a 2.1 megawatt system and 500 kilowatt battery storage unit. The implementation will cover about three acres of open field on the campus, a third of the campus parking and the roof of a learning resource center.

College of the Redwoods

When fully deployed, the solar power will provide about 90 percent of the power needed by the Eureka-based main campus. Construction will start after a feasibility study by utility PG&E is completed. That's expected to take about a year. Installation will take an additional three months.

The deal eliminates capital outlay. Forefront will design, construct, own, operate and maintain the grid. The college will buy its power from the company for a flat rate for the next two decades. At that point, the college district will take ownership of the system.

The agreement includes a performance guarantee. Should there be any period when the grid fails to generate sufficient power to meet the 90 percent threshold and the college has to buy additional power from PG&E, ForeFront will cover the difference in pricing.

The school also hopes to make the grid a "living lab" as part of its Solar Technology program, with students serving internships and getting fellowships. ForeFront will also give the school renewable education resources.

"The number of jobs in solar energy is rising exponentially in California, and this project will give our students real-word insight into the knowledge and skills necessary to excel in this growing field," said Kerry Mayer, the college's dean of career education, in a statement.

"Our trustees know that expanding the use of solar power will not only provide a reliable energy source for the campus and a platform for additional academic programming, but it will also help mitigate the problems associated with climate change," added President Keith Flamer.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.