Nebraska HS Begins Renovations for Industrial Arts Technology Center

Renovations to make way for a new industrial arts technology center began at Blair High School, reports the Pilot-Tribune & Enterprise.

The updated facility will house a welding lab identical to one at Metropolitan Community College, fostering a partnership between the high school and community college. High school students will be able to take college/dual credit courses in welding, manufacturing and computer programming, at no cost to the district.

The 14,000-square-foot renovation includes a construction science lab, manufacturing lab, automotive lab, art room, and computer science and robotics lab. The original building was completed in 1970.

Featured

  • Chicago District Completes Construction on New Elementary School

    North Chicago School District 187 in North Chicago, Ill., recently held a ribbon-cutting ceremony for the new Forrestal Elementary School, according to a news release. The new school marks a major investment in military-connected students and families at Naval Station Great Lakes.

  • Arizona District Breaks Ground on Community Training, Learning Center

    The Tolleson Union High School District (TUHSD) in Tolleson, Ariz., recently broke ground on a new Training & Learning Center (TLC) for both district professionals and the community at large, according to a news release. The 90,000-square-foot facility has an estimated completion date of spring 2027.

  • abstract illustration of school gym

    How the Gymnasium Can Serve as a Model for Learning Space Design

    Multipurpose gyms work because flexibility was built into the brief from the start, not retrofitted later. The same logic applies to academic spaces.

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.