Harvard Buys Electric Shuttles

Harvard University has invested in four electric buses, representing nearly a third of its fleet. The vehicles will replace four similarly-sized bio-diesel vehicles already operating on campus. Each of the new buses, from Proterra, is 35 feet long (similar in size to the current buses), has a seating capacity of 29 and runs on a 450-kWh battery.

Along with the buses, the institution has also invested in an 800-volt infrastructure. The shuttles will be plugged in during off-peak hours overnight, using 150 kW charging stations that will allow the vehicles to be "fast-charged" in about three hours.

The fleet transports about 600,000 students annually across Harvard's campus. The shift to electric is expected to lower greenhouse gas emissions by more than 110 tons annually. Their use will also reduce the amount of air pollutants, providing health benefits to the community.

According to the U.S. Department of Energy, electric motors are exceptionally quiet, provide stronger acceleration and require less maintenance than traditional engines because they have fewer moving parts and fluids to change. Electric vehicles can convert more than three-quarters (77 percent) of their electric energy into power at the wheels while typical gas-powered vehicles convert less than 30 percent.

"We're always looking for ways to improve the efficiency and sustainability of our fleet," said John Nolan, managing director for the university's Transportation Services. "This is a transformational project that can have a tremendously positive impact in the community and significantly move the needle towards a more sustainable future."

"I am thrilled to see Harvard modeling the pathway to electric bus fleets to improve public health and address climate change as part of the broader commitment to be fossil fuel-free by 2050," noted Elsie Sunderland, professor of Environmental Science and Engineering at Harvard's Department of Environmental Health.

"Harvard takes its responsibility of being a good neighbor seriously," added David Harris, director of Transit & Fleet Management. "One of the great things about this project is that the buses will produce much less noise and operate far more smoothly as they navigate the densely populated streets of Cambridge and Allston."

The project was supported with a grant from the Massachusetts Department of Environmental Protection and a loan from the Harvard Green Revolving Fund.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.