Austin ISD Surveys Damage After Winter Storm

Austin Independent School District (AISD) officials in Austin, Texas, spent last week walking through schools and surveying the aftermath of the recent wave of winter storms. The verdict: Ninety of the district’s 130 schools were affected, and the total damage is estimated at about $15 million.

The damage includes HVAC systems that have gone down, broken water lines and supply lines, and flooding from adjacent properties that seeped into schools, according to Matias Segura, AISD operations manager. At least 15 school kitchens in the district experienced broken freezers, spoiled food, and a lack of running water.

Winter storm

“We feel extremely lucky. I think with the amount of power outages and alarms we heard, we were expecting a lot more [of the refrigerators to be broken],” said AISD interim director of Food Service and Warehouse Operations Christine Steenport. She said that maintenance teams are “working on gathering all that information, making sure there are plumbers on site to fix leaks and identify areas where that help is needed.”

Most schools in the district were able to welcome students back on March 1. However, for the most severely damaged schools—Kocurek Elementary School, Bertha Sadler Means Young Women’s Academy, Gus Garcia Young Men’s Leadership Academy, and Bowie High School—plans to repair and reopen are still a work in progress.

The funding for repairs is coming from the school district’s general fund, with expectations for reimbursement by either FEMA or insurance. Segura said that some wings of the schools that opened on March 1 may still be closed for student and faculty safety.

“Our commitment is to make sure that our facilities are warm, safe, and dry. That is absolutely critical. We will not open a space up until it’s 100% ready to go,” said Segura. “What that means is that we will need patience. We are going to need some grace to get through the work.”

Across Central Texas, many other school districts endured similar problems. At the Hays CISD, the library flooded. At the Eanes ISD, workers and school officials removed soaked sheet rock and drywall and carried it outside to be thrown away during their damage survey. And in Burnet CISD, a whole campus auditorium flooded thanks to a cracked pipe.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Rice University to Build New Student Life Complex

    Rice University in Houston, Texas, recently announced that a groundbreaking ceremony for the upcoming Moody Center Complex for Student Life (MCCSL) will take place on May 8, 2025, according to a university news release. The 75,000-square-foot facility was designed by architecture firm Olson Kundig with Page serving as executive architect, and it has an estimated completion date of fall 2027.

  • Mesa West Capital Provides Loan to Refinance University of Georgia Residence Complex

    Mesa West Capital recently announced that it has provided a $133.9-million, short-term, first mortgage loan to developer LV Collective (“LV”) to refinance a student housing complex near the University of Georgia, according to a news release. Rambler Athens, a 750-bed residence hall adjacent to the campus, was completed in August 2024.

  • ECM Technologies Wins ‘Most Innovative Business of the Year’ Award

    HVAC preventative maintenance and efficiency solutions provider ECM Technologies was recently named the “Most Innovative Business of the Year” at the 2025 Champions of Change Awards, according to a news release. The program recognizes Arizona business leaders and organizations taking steps to make a positive impact on the state through innovative thinking and philanthropy.

  • Lewis C. Cassidy Elementary School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Lewis C. Cassidy Elementary School has been recognized with an EDS 2025 Grand Prize award in the category of New Construction.

Digital Edition