Austin ISD Surveys Damage After Winter Storm

Austin Independent School District (AISD) officials in Austin, Texas, spent last week walking through schools and surveying the aftermath of the recent wave of winter storms. The verdict: Ninety of the district’s 130 schools were affected, and the total damage is estimated at about $15 million.

The damage includes HVAC systems that have gone down, broken water lines and supply lines, and flooding from adjacent properties that seeped into schools, according to Matias Segura, AISD operations manager. At least 15 school kitchens in the district experienced broken freezers, spoiled food, and a lack of running water.

Winter storm

“We feel extremely lucky. I think with the amount of power outages and alarms we heard, we were expecting a lot more [of the refrigerators to be broken],” said AISD interim director of Food Service and Warehouse Operations Christine Steenport. She said that maintenance teams are “working on gathering all that information, making sure there are plumbers on site to fix leaks and identify areas where that help is needed.”

Most schools in the district were able to welcome students back on March 1. However, for the most severely damaged schools—Kocurek Elementary School, Bertha Sadler Means Young Women’s Academy, Gus Garcia Young Men’s Leadership Academy, and Bowie High School—plans to repair and reopen are still a work in progress.

The funding for repairs is coming from the school district’s general fund, with expectations for reimbursement by either FEMA or insurance. Segura said that some wings of the schools that opened on March 1 may still be closed for student and faculty safety.

“Our commitment is to make sure that our facilities are warm, safe, and dry. That is absolutely critical. We will not open a space up until it’s 100% ready to go,” said Segura. “What that means is that we will need patience. We are going to need some grace to get through the work.”

Across Central Texas, many other school districts endured similar problems. At the Hays CISD, the library flooded. At the Eanes ISD, workers and school officials removed soaked sheet rock and drywall and carried it outside to be thrown away during their damage survey. And in Burnet CISD, a whole campus auditorium flooded thanks to a cracked pipe.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Little Grand Market

    Designing for Belonging: Why Student Wellness Starts with Space

    From walkable site planning to flexible interiors, intentional design choices play a critical role in how students experience comfort, connection, and community.

  • Texas State University Completes Stadium Renovations

    Texas State University in San Marcos, Texas, recently announced that it has completed a series of additions and renovations to its football stadium, according to a news release. Formerly known as the Bobcat Stadium End Zone Complex, the Johnny and Nathali Weisman Football Performance Center is an 85,000-square-foot expansion featuring hospitality spaces, banquet spaces, exterior concourses, and upgrades to the field house.

  • Photo credit: Elkus Manfredi Architects

    University of Virginia Selects Design-Build Team for New Residential Complex

    The University of Virginia in Charlottesville, Va., recently announced that it has selected a design-build team for a new upper-class residential development on campus, according to a news release. Capstone Development Partners—in partnership with Elkus Manfredi Architects and the Hoar Construction/Hourigan construction team—will move forward with the three-building, 310,000-square-foot housing facility.

  • University of Illinois Moves Forward with College Sports’ Largest Digital Scoreboard

    The University of Illinois in Champaign, Ill., recently announced a series of upgrades to Gies Memorial Stadium that will include the largest scoreboard in college sports, according to a news release.

Digital Edition