Small-Town Native to Fund $40M K–12 Renovation Project

The Winifred School, part of Winifred Public Schools in Winifred, Mont., is set to receive a series of high-tech upgrades and renovations that would double the school’s original size. Upgrades to the K–12 school will include lab spaces, a woodworking area, an agricultural science space, a car repair space, and a full-size gym featuring an indoor track.

The project is the initiative of Norman Asbjornson, who grew up in Winifred and went on to found HVAC company AAON, Inc. Asbjornson is funding the entire $40-million project himself and expressed a desire to give back to his hometown, which has a population of about 200.

“I’m more than capable financially of doing a significant contribution, and I said, ‘Well, if you’re committed to it, then I’ll dial in. And if we’re going to do it, we’re going to do it right,’” he said. “I am guiding it a little bit to the architect and type of school, and making sure everything that could be done to make an outstanding school in the state of Montana.”

The school is partnering with A&E Design on the project. The school’s new layout is meant to encourage collaboration and encourage an active learning environment with multidisciplinary work spaces. “The vision, particularly from Norman and the design team as a whole, is that we could start to see this level of education facility ripple throughout the state—that this will be a model for others to look to and say, ‘How do I accomplish that?’” said Dusty Eaton of A&E Design.

In May 2020, AAON’s Board of Directors donated $1.25 million to the Winifred Montana Public Schools District in honor of Asbjornson, to be used for the construction of a new K–12 public school building.

“The town is becoming a better town all the time, and it’s raising a lot more prime citizens for the future, who will hopefully someday return the favor to the town when they’re capable and continue to make Winifred and Montana a better town and a better state,” Asbjornson said.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Photo courtesy of Kraus-Anderson

    Minnesota District Completes $49.7M Addition, Renovation Project

    St. Paul Public Schools in St. Paul, Minn., recently announced the completion of a $49.7-million addition and remodeling project at two district schools, according to a news release.

  • How a Portable Sink Helped an Art Classroom Run More Smoothly

    Classroom design decisions can have outsized effects on instructional time and safety at schools juggling mismatched infrastructure, strict budgets, and crowded schedules — particularly in the arts. Between spilled paint and dirty brushes, art classes run smoother with a sink in the studio. But many schools don’t have a sink in every art classroom.

  • California School District Completes Elementary School Modernization

    The San Diego Unified School District in San Diego, Calif., recently held a ribbon-cutting for a whole-site modernization of Pacific Beach Elementary School, according to local news. The school first opened with one building in 1930 and added six more between 1938 and 1957.

  • Chartwells Launches Campus Dining Evaluation Framework

    Contract food-service management provider Chartwells Higher Education recently announced the launch of BLUEPRINT, according to a news release. The evaluation framework was designed to provide a data-driven and customizable roadmap towards optimizing campus dining services and, by extension, the student experience.