Kroger Donates $3M to University of Louisville Indoor Baseball Facility

The Kroger Louisville Division announced this week that it is donating $3 million toward the construction of an indoor baseball practice facility at the University of Louisville in Louisville, Ky. The facility will be built onto the campus’ Jim Patterson Stadium.

The gift will come in yearly $300,000 installments over 10 years. The university is still seeking funds for the facility, which will cost an estimated $12 million. It has not yet established a timetable for construction, but design plans indicate a 28,000–35,000-square-foot facility featuring an indoor artificial turf surface, a pitching lab, and sufficient space for an entire infield.

“Kroger has made an amazing difference in the community, across campus, and by supporting our student athlete experience,” said Vince Tyra, University of Louisville Vice President/Director of Athletics. “We have a number of shared values that led us to today’s announcement of Kroger’s lead gift toward an indoor performance facility for our baseball team.”

“We are proud to announce our gift of $3 million to be donated toward the construction of the new indoor baseball practice facility here at Jim Patterson Stadium,” said Ann Reed, Division President of Kroger Louisville. “This new facility will help ensure the best recruits and talent come right here to Louisville.”

Other Kroger donations to University of Louisville athletics include sponsorship of the Governor’s Cup trophy (awarded to the winner of the yearly Kentucky-Louisville football game) and $10,000 in scholarships annually since 1994.

“This is a great day for the Louisville baseball program,” said the university’s head baseball coach, Dan McDonnell. “Our program is all about excellence, a value that we share with Kroger. Excellence in the classroom, on the diamond, and in this great community. We want to express our gratitude to Ann Reed and the Kroger family for their commitment to Louisville baseball and our continued pursuit of excellence.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Year-Round Schools Require Year-Round Indoor Air Quality Planning

    While many schools are out for the summer, year-round schools follow a more “balanced” schedule with shorter, more frequent breaks spaced throughout the school year. Even though this offers educational benefits, these facilities have less downtime for building maintenance. This can become an issue when facilities managers overlook the importance of routine HVAC maintenance and air duct cleaning services.

  • Wyoming District Breaks Ground on New Elementary School

    Laramie County School District #1 in Cheyenne, Wy., recently held a groundbreaking ceremony for the upcoming Mountain View Elementary School, according to a news release. The facility has an estimated completion date of summer 2028, and it will have the capacity for 650 students in fifth and sixth grade.

  • Texas Recruitment

    Texas Recruitment

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The University of Texas at Austin's Texas Recruitment has been recognized with an EDS 2026 Grand Prize award in the category of Renovation.

  • Building Beyond Simulation: Creating Immersive Ecosystems for Healthcare Education

    Health sciences education is one of the fastest-growing facility types in colleges and universities. The demand for medical, nursing, and allied health professionals is driving the creation and renovation of medical simulation training facilities that provide students with real-world experience through advanced simulation-based learning.