P.K. Yonge Middle-High School Construction Complete

SchenkelShultz Architecture announced this week that construction of the Middle-High School at the P.K. Yonge Developmental Research School in Gainesville, Fla., is complete. The public, K–12 school was designed to meet the LEED Gold Certification standard as set by the U.S. Green Building Council.

Affiliated with the University of Florida College of Education, the school is known for its innovative educational curricula and programs that provide each student with an optimized learning experience and environment. The facility was also awarded first place in the Architectural Showcase presented by the Florida Education Facilities Planners’ Association (FEFPA).

P.K. Yonge Developmental Research School

“Our goal was to design a physical environment that was an embodiment of the school’s mission to ‘design, test and disseminate innovations in education,’” said J. David Torbert, partner with SchenkelShultz Architecture. “We collaborated closely with P.K. Yonge’s Leadership Team, educators and students to create a new building that prioritizes active, participatory learning within a safe and secure environment.”

The three-story building was designed to create a student-centered, flexible, and technology-rich learning environment that fosters collaboration. It features amenities like STEM labs, open collaboration areas, distance-learning labs, open collaboration spaces, and break-out spaces for small groups. It was built to replace an existing, 60-year-old facility.

The construction manager for the project was Parrish McCall Constructors.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Philadelphia Middle School Facility Earns LEED Gold Certification

    The Alternative Middle Years (AMY) at James Martin Middle School in Philadelphia, Penn., recently received a LEED Gold certification from the U.S. Green Building Council, according to a news release. The School District of Pennsylvania partnered with KSS Architects on the project.

  • Myrtle Grove Elementary

    Phased Construction Keeps Students on Campus During Rebuild

    When Escambia County School District needed to replace most of Myrtle Grove Elementary School in Pensacola, Fla., it had three distinct challenges: honor the school's legacy in the community, bring state-of-the-art learning environments to the county, and be seamlessly built on the same site as the active school campus.

  • Secret to Efficient, On-Time School Infrastructure & Modernization Projects is All in the Preparation

    Warmer weather and longer days make summer the ideal time for construction and modernization projects at educational facilities. School boards and construction firms must coordinate effectively to ensure that these projects do not extend even a single day into the school year and impede classroom operation.

  • Haws Corporation Marks 120th Anniversary

    Haws Corporation, which provides hydration and emergency safety solutions worldwide, recently announced that the company is celebrating its 120th anniversary this year, according to a news release.