Gonzaga University Names New Integrated Science and Engineering Facility

Gonzaga University in Spokane, Wash., announced this week that it has named its new Integrated Science and Engineering facility: The John and Joan Bollier Family Center for Integrated Science and Engineering is scheduled to open this fall. The Bollier family, from Newberg, Ore., provided a significant donation for the construction of the $49.7-million facility.

“The Bollier family exemplifies the values, commitment, and spirit of this community. John, Joan, Brett, Emily, and Nolan’s thoughtful and generous leadership makes a significant difference in ensuring the University delivers on this mission,” said Gonzaga President Thayne M. McCulloh, D.Phil. “Because of the Bolliers, Gonzaga’s commitment to Jesuit STEM education and research will have an impact on the Inland Northwest and beyond for generations to come. I am truly thankful for the support and Zag spirit with which they show up each day.”

According to a press release, in September, faculty and staff will move into their offices and common areas, study spaces and labs will open to students. Classes are scheduled to begin in the spring 2022 semester. The 82,000-square-foot space will focus on STEM education at Gonzaga and place a special emphasis on cross-disciplinary collaboration. The building will feature skybridges connecting it to the PACCAR Center for Applied Science and to the College of Arts and Sciences’ chemistry and biology departments in Hughes Hall.

According to a brochure on the university website, the new facility will increase the university’s STEM space by 44% and add 18 new labs, including a Psych Suite, a math lab, an innovation lab, a circuits lab, technology and engineering labs, student project wet & dry labs, a dynamics & vibration lab, an innovation studio, and more.

The project’s lead architect is SRG Partnership Inc. of Portland, Ore., partnering with Integrus Architecture of Spokane, Wash.; Research Facilities Design of San Diego, Calif.; MW Engineers of Spokane; and DCI Engineers of Spokane.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Enjoy Tax and Energy Savings with the Right Ceiling Solutions

    Thanks to recent innovations pairing mineral fiber ceiling panels with phase change material technology (PCM), architects, designers, facility managers, and other key players in construction and renovation projects are re-thinking the role ceilings play in supporting environmental objectives—especially energy savings.

  • Texas District Breaks Ground on New Elementary School

    The Splendora Independent School District (SISD) in Splendora, Texas, recently broke ground on a replacement facility for Greenleaf Elementary School, according to a news release. The district partnered with planning, engineering and program management firm Lockwood, Andrews & Newnam, Inc. (LAN) for the project.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

  • Rice University to Build New Student Life Complex

    Rice University in Houston, Texas, recently announced that a groundbreaking ceremony for the upcoming Moody Center Complex for Student Life (MCCSL) will take place on May 8, 2025, according to a university news release. The 75,000-square-foot facility was designed by architecture firm Olson Kundig with Page serving as executive architect, and it has an estimated completion date of fall 2027.

Digital Edition