Kent State Board Approves College of Aeronautics and Engineering Building Addition

During its quarterly meeting last week, the Kent State University Board of Trustees approved an addition to the university’s Aeronautics and Engineering Building. The College of Aeronautics and Engineering opened in spring 2015, and since then, enrollment has grown enough to require additional space for faculty research and student classes and labs.

According to a press release, the building’s three-story addition will measure in at 41,449 gross square feet and feature classrooms, instructional and research laboratories, active teaching classrooms, cyber classrooms, networking labs, and faculty offices.

Kent State College of Aeronautics and Engineering addition

Design and construction documents are scheduled for completion by August. After bidding and contract negotiations, groundbreaking should take place in October 2021 for a 14-month construction process. The new facility would open to faculty and students in time for the spring 2023 semester.

The project’s estimated price tag is $19.6 million. Of this, $14.1 million is slated to come from 2020 bond proceeds, $4 million from local funds, and $1.5 million from philanthropic gifts to the university.

A press release states that enrollment in Kent State University’s College of Aeronautics and Engineering has increased by 52 percent since 2019 and by 7 percent since 2020, despite the coronavirus pandemic. A gap between the available workforce and industry needs sets up a wide variety of opportunities for new graduates.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.