Golden West College Starts Construction on Language Arts Complex

Construction on a new language arts complex recently began at Golden West College in Huntington Beach, Calif. The college is partnering with Sundt Construction, Inc., on the facility.

“We are excited to continue working on the Golden West campus,” said John Messick, Sundt’s Project Director for the California District Building Group. “Building infrastructure to support remote, in-person or hybrid learning is critical to the success of today’s students.”

The new complex will measure in at 72,251 square feet and stand three stories tall, featuring classrooms and a large reading, writing and resource center. The facility will house lecture spaces for the college’s world languages, ASL, English and speech programs. Other amenities will include gathering, office and support spaces; natural daylighting fixtures; modern LED fixtures; HVAC improvements; and native landscaping.

Project architect HMC designed the complex as two wings connected by a second- and third-floor internal bridge. “Guided by the principle of ‘connection,’ we designed the building to not only connect with the campus aesthetic, but also to provide opportunities for students to connect with campus touchpoints and classmates,” said HMC Design Principal Brett Leavitt.

The HMC Architects’ website also notes that design strategies like natural daylighting and native landscaping give the complex a head start on becoming a Zero Net Energy Building.

The first step of the construction process was the demolition of the long-standing humanities building and health sciences facility. Construction is scheduled for completion by the end of 2021.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.