UArizona Constructing Flexible Research Spaces for Interdisciplinary Projects

University of Arizona broke ground this week on its new Grand Challenges Research Building, a 115,000-square-foot facility that will house a variety of labs, offices and flexible research spaces.

"Grand Challenges" refers to the second pillar of UArizona's five-pillared "living" strategic plan. The Grand Challenges pillar involves "tackling society’s biggest challenges by enabling discoveries that will fundamentally shape the future."

To that end, the new seven-story building will will serve a wide range of functions. According to UArizona, the ground floor will include "public spaces, study spaces and meeting rooms to support student engagement and instruction."

The three floors above that will include "laboratories and offices dedicated to faculty growth in the James C. Wyant College of Optical Sciences."

The remaining three floors will be "dedicated to research laboratories and offices for centers and cross-campus interdisciplinary programs, including the new Center for Quantum Networks, led by the College of Optical Sciences."

UArizona Constructing Flexible Research Spaces for Interdisciplinary Projects
Source: University of Arizona/ZGF Architects and BWS Architects.

The cost of the building was reported at $99 million. It will be connected to the Meinel Optical Sciences Building. Construction is expected to be completed by February 2024. Design is being handled by ZGF Architects and BWS Architects. Construction for the project is being handled by Kitchell Contractors, which was also "the contractor for the university's Health Science Innovation Building, a 220,000-square-foot building that opened in 2019," according to UArizona.

About the Author

David Nagel is the former editorial director of 1105 Media's Education Group and editor-in-chief of THE Journal, STEAM Universe, and Spaces4Learning. A 30-year publishing veteran, Nagel has led or contributed to dozens of technology, art, marketing, media, and business publications.

He can be reached at [email protected]. You can also connect with him on LinkedIn at https://www.linkedin.com/in/davidrnagel/ .


Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.