Silicon Valley Debuts New Elementary School

A new elementary school recently opened in Foster City, Calif., as part of the San Mateo-Foster City School District (SMFCSD). Beach Park Elementary School lies in the Silicon Valley area, about halfway between San Jose and San Francisco, Calif. The district partnered with design firm HMC Architects and general contracting firm C. Overaa & Co. The facility has a capacity of 420 students and was funded through the Measure X bond measure. The bond was passed by voters in 2016 and set aside $148 million to address overcrowding issues in schools.

According to a press release, the school features amenities like classroom clusters with shared indoor and outdoor collaboration areas; a flexible Library/Media Center featuring small group instructional rooms, learning nooks and quiet areas; a multipurpose building with a kitchen and server; flexible furniture placed throughout the building; and accent colors of terracotta, blue and green that represent the school’s vision. It also has 17 individual classrooms, an administration building and an outdoor play area.

As of February 2021, the facility’s budget was an estimated $80 million.

“The school is designed for flexibility and embraces NextGen learning modalities,” said Marko Blagojevic, managing principal of the HMC San Jose studio. “The design team developed classroom clusters, learning nodes and indoor and outdoor collaboration areas in order to heighten indoor-outdoor spatial relationships, flexible learning environments and shared collaboration spaces. It is incredibly rewarding to see excited students and teachers engage in such a setting and take ownership of their environment.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

  • California High School Starts Construction on New CTE Building

    Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking.

  • modern college building with circuit and brain motifs

    Anthropic Introduces Claude for Education

    Anthropic has launched a version of its Claude AI assistant tailored for higher education institutions. Claude for Education "gives academic institutions secure, reliable AI access for their entire community," the company said, to enable colleges and universities to develop and implement AI-enabled approaches across teaching, learning, and administration.

Digital Edition