University of Arizona Completes Student Success District

The University of Arizona in Tucson, Ariz., recently completed an $81-million, seven-year construction project called the Student Success District. The project’s goal was to centralize and upgrade a variety of crucial student resources including library services, tutoring and advising, mentoring and career services, and health programs within a single area of campus.

The final phase of construction—the renovation of Bear Down Gymnasium with a restored basketball court, exercise space, a Campus Health satellite office and tutoring rooms—wrapped up in January. The renovated gym connects with the also-newly-renovated Main Library and Albert B. Weaver Science-Engineering Library, as well as with a new building, the Bartlett Academic Success Center. The project also created outdoor common areas (with amenities like power outlets) for students to gather and study.

“The idea is that by bringing all these services that were previously at different locations across campus, you’re not only increasing awareness, but you’re increasing utilization through awareness,” said Dean of University Libraries Shan Sutton.

The Bartlett Academic Success Center opened in fall 2021 and contains a variety of academic support resources like the UA Thrive Center; Student Engagement and Career Development; and academic advising for students in the colleges of humanities, social and behavioral sciences and science.

Renovations to the Main Library transformed its first and second floors to include new study spaces and upgraded technology. The second floor now plays home to CATalyst Studios, which contains virtual reality studios and 3D printers open to all university students. Renovations to the Science-Engineering Library, meanwhile, added more study space and more natural light to increase opportunities for collaborative studying.

The university partnered with Sundt Construction for construction services and with Poster Mirto McDonald (PMM) and the San Diego office of Miller Hull for the design. Phased construction began in August 2019.

“Student success is the highest priority for us here at the University of Arizona,” said Liesl Folks, senior vice president for academic affairs and provost. “The District's structure demonstrates our commitment to inclusion and access for all students on our campus and provides them with easily accessible resources to reach their academic and career goals. I am very excited to see these facilities coming to life, and look forward to witnessing the positive impact they have, now and for years to come.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Year-Round Schools Require Year-Round Indoor Air Quality Planning

    While many schools are out for the summer, year-round schools follow a more “balanced” schedule with shorter, more frequent breaks spaced throughout the school year. Even though this offers educational benefits, these facilities have less downtime for building maintenance. This can become an issue when facilities managers overlook the importance of routine HVAC maintenance and air duct cleaning services.

  • Wyoming District Breaks Ground on New Elementary School

    Laramie County School District #1 in Cheyenne, Wy., recently held a groundbreaking ceremony for the upcoming Mountain View Elementary School, according to a news release. The facility has an estimated completion date of summer 2028, and it will have the capacity for 650 students in fifth and sixth grade.

  • Amazon Expands Lockers to More Than 500 College, University Campuses

    Amazon recently announced that its Locker Network now totals more than 750 locations at more than 500 college and university campuses around the United States, according to a company news release.

  • Back-to-School Playground Safety: 7 Common Hazards to Look for After Summer Break

    As summer break comes to an end, school administrators have plenty to prepare before students return. While classrooms, hallways and common areas often receive attention during all the back-to-school preparations, the playground should not be overlooked. Months of weather exposure, storms, and regular wear can leave behind hazards that may not be immediately noticeable.