Birchwood Lighting Releases New Acoustic Luminaries, Panels

Birchwood Lighting recently announced the launch of a new set of acoustic luminaries and panels designed for large, open spaces. The BWA250 luminaries and panels are intended to provide both seamless illumination and sound dampening capabilities in large open environments like open office spaces, common areas and educational environments, according to a press release.

BWA250 comes with an NRC rating of 0.95 and uses BW Acoustic material to absorb internal and external sound influences, lowering the room’s noise level. It’s available in non-lit or lit configurations ranging from 200–900 lm/W. Its sustainable housing is made of 60 percent post-consumer recycled materials, the news release states.

“The introduction of BWA250 represents a move toward a minimalistic yet functional design philosophy for Birchwood,” said Adam Zepeda, senior director of brand management for Birchwood Lighting. “Its minimal yet flexible internal structure means the acoustic shroud can be customized to various heights, allowing users to customize the luminaries and panels to fit the size and needs of their spaces.”

Birchwood Lighting, a Leviton Company, is headquartered in Anaheim, Calif.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • El Paso District Breaks Ground on New Elementary School

    The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027.

  • Construction Begins on East Austin CTE-Focused High School

    The Del Valle Independent School District recently announced that construction has begun on a new CTE-focused high school in Austin, Texas, according to a news release. Del Valle High School will measure in at 473,338 square feet and have the capacity for 2,400 students.

  • LSU Breaks Ground on $200M Residential Project

    Louisiana State University in Baton Rouge, La., recently broke ground on a new residential complex, according to university news. The South Quad residential project will consist of two buildings and add a total of 1,266 beds for freshmen students. The development comes with a price tag of $200 million, and it’s scheduled to open to students in fall 2027.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

Digital Edition