Howard University Announces $785M Construction, Renovation Plan

Howard University in Washington, D.C., recently announced plans for a $785-million construction initiative that will involve building three new academic halls and renovating multiple existing structures around campus. The project is the largest construction real estate investment in the school’s history, according to a news release. Construction is scheduled to begin this year and be completed by 2026.

The development is part of a phased Central Campus Master Plan that was announced in 2020 in response to an increase in enrollment and philanthropic investments. The Washington Post reports that enrollment jumped by 28 percent in two years, from 9,399 students in fall 2019 to 12,065 students in fall 2021.

 $670 million will go toward the new construction of three new academic halls. The Health Sciences Complex will play home to the Colleges of Medicine, Dentistry, Pharmacy and Nursing and Allied Health Sciences. The Center for Arts and Communications will house the Chadwick A. Boseman College of Fine Arts and the Cathy Hughes School of Communications. Finally, the STEM Center will contain STEM programs like chemistry, physics, biology, engineering, math and related lab spaces.

The three facilities will be the campus’ first new academic buildings since 1984.

“This is a watershed moment in the history of our institution,” said Howard University President Wayne A. I. Frederick. “Because of the tremendously enhanced financial posture we have worked so hard to achieve, the state of the University has never been stronger. The leadership of our board and executive team—along with the caliber of students we have enrolled, the illustrious faculty we have assembled, the dedicated staff we have hired, and the committed alumni base we have cultivated—presents an opportunity for us to solidify Howard’s status as one of the preeminent institutions of higher education in the country.”

The initiative also includes renovations to the Myrtilla Miner Building, which will house the School of Education and the Howard University Middle School for Mathematics and Science.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.